Menu

Strip Plan Details

DEA : DEA UEAP Tehri

Sub Project : 5413-Internal MR Of Canal Road To Sahastradhara Road In Raipur Block
Sno. Feature Name Start Chainage
(in km.)
Length (in mtrs.) Progress (in %)
1 BM 0.250 10.000 100.00
2 BM 0.360 15.000 100.00
3 BM 1.000 10.000 100.00
4 BM 1.080 5.000 100.00
5 BM 1.110 10.000 100.00
6 BM 1.270 20.000 100.00
7 SDBC 0.250 260.000 100.00
8 SDBC 0.990 10.000 100.00
9 SDBC 1.173 187.000 100.00
10 SDBC 0.000 145.000 100.00
11 Pucca drain 0.300 210.000 100.00
12 Pucca drain 0.000 145.000 100.00
13 Pucca drain 1.180 180.000 100.00
14 Pucca drain 0.850 100.000 100.00
15 Pucca drain 1.002 91.000 100.00
16 Pucca drain 0.640 210.000 100.00
17 Retaining Wall 0.780 16.800 100.00
Total Number of Features: 17