Sub Project Profile Report

Project:  District: Package: Sub Project: 

Sub Project Profile Report

Reconstruction of internal roads of nagar panchayat Munsiyari Work Completed
Project: UEAP-RB UID: 5610 Sanction Cost: 477.00  lakh Length: 6.250 KM.
District: Pithoragarh Block: Munsiari Constituency: Dharchula Circle:
DEA: DEA UEAP Pithoragarh DSC: CCEE Group India Pvt.Ltd DSC Scope: Design and Supervision Type: VR
Procurement:
Package No.: 1079        Package Name:  UEAP/PWD/C-75        Tender Date: 27-06-2015        Current Status: Agreement signed        Achieved on Date: 28-10-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UEAP/PWD/C-75      Contractor Name: R K Gupta Contractor
Start Date:  18-11-2015      Intended Completion Date:  17-11-2016     
Total Bond Cost: 42904458 (429.04 lakh)       
LD Analysis for Milestone1: calculated LD is Rs 879532 for 41 days        LD Analysis for Milestone2: calculated LD is Rs 2509884 for 117 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakh)
Start Date End Date Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakh)
1.GSB/RBI/G-10.70 KM2.5502-09-201616-09-20160.70 KM0.70 KM0.622.55
2.G-20.70 KM2.2302-09-201619-09-20160.70 KM0.70 KM0.542.23
3.G-31.76 KM9.8302-09-201624-09-20161.76 KM1.76 KM2.399.83
4.PC/CC i/c Prime Coat, Tack Coat1.76 KM14.8315-09-201620-10-20161.76 KM1.76 KM3.6114.83
5.BM i/c Prime Coat, Tack Coat6.30 KM131.2015-09-201620-10-20166.30 KM6.30 KM31.95131.20
6.SDBC i/c Tackcoat6.30 KM87.6415-09-201620-10-20166.30 KM6.30 KM21.3487.64
7.longitudinal Drain6540.00 m69.5215-09-201620-10-20166540.00 m6540.00 m16.9369.52
8.Crash Barrier3000.00 m90.0025-02-201601-04-20163000.00 m3000.00 m21.9290.00
9.Road Furniture80.00 No2.8015-09-201620-10-201680.00 No80.00 No0.682.80
Total Amount: 410.6 100   410.6
Remarks:        Work Program Made On: 12-09-2016        Updation of work program on:       
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.19-March-201652.64  lakh
2.25-April-201627.64  lakh
3.22-June-201685.63  lakh
4.27-October-201627.76  lakh
5.25-November-201638.45  lakh
6.16-December-201619.20  lakh
Total 251.32  lakh
% Payment 58.58 %
Advance Amount:  0.00  lakh        Recovered Amount:  0.00  lakh        Balance to be Recovered  0.00  lakh        * Advances are at package level not sub project level
Analysis:Bill sh ould be issued
Tracking Signal of Subproject.
Pending Environmental & Social issues
Environment & Social Compliances(Package level):
Environment & Social Compliances(Sub Project level):
Detailed report of this subproject
Quality
No. of Test Required : 186   No. of Test Done : 182    No. of Test Passed : 161   No. of Test Failed : 0    No. of Test Result Awaited : 11     Test report of this package      * Tests Information is at package level not sub project level
Quality Ranking in %: 86.55
Number of Notice(s) issued: 67

Mobile Pic Upload

Number of Pics Available on Web Repository: 56
( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.10-11-2016Chng 0.000 to 0.100 gic roadTack coat on bm surface for sdbc layingAnkit NakotiAEUEAP- CA See Pic
2.10-11-2016Chng 0.150-0.175 G.I.C. RoadLoose thickness for sdbcAnkit NakotiAEUEAP- CA See Pic
3.10-11-2016Chng.150-.175 G.I.C. roadCompacted thickness reqd 25 mm loose thickness during layibg achieved as 35 mmAnkit NakotiAEUEAP- CA See Pic
4.10-11-2016Animal hosp road chng. .900 to 1.000 near zara hotel103 degree celcius temp achieved using evotherm addmixture at 2232 m altitudeAnkit NakotiAEUEAP- CA See Pic
5.26-10-20160.125 to 0.150 animal hospital aproach roadSdbc thickness loose 35 mm achieved during laying required thickness after compaction 25 mmAnkit NakotiAEUEAP- CA See Pic
6.26-10-2016Chng 0.250-0.200 animal hospital roadSdbc surface dUring rollingAnkit NakotiAEUEAP- CA See Pic
7.26-10-20160.375 near helipad animal hospital roadSdbc lahingAnkit NakotiAEUEAP- CA See Pic
8.26-10-2016Near helipadTack coat for.sdc laying @ animal.hospital roadAnkit NakotiAEUEAP- CA See Pic
9.26-10-2016Chng 0.600-0.650 animal hospital roadRolling on bm surfaceAnkit NakotiAEUEAP- CA See Pic
10.25-10-2016ChNg + 0.025 to +0.050Rolling on bm surfaceAnkit NakotiAEUEAP- CA See Pic
11.24-10-2016Near helipadRolling on bm surfaceAnkit NakotiAEUEAP- CA See Pic
12.24-10-2016Near helipadRolling om bm surfaceAnkit NakotiAEUEAP- CA See Pic
13.29-08-2016Police station aproach roadInspection se sirAnkit NakotiAEUEAP- CA See Pic
14.29-08-2016Dhandadhaar jyati m/rInspection of SE sir, for checking of grading for G2Ankit NakotiAEUEAP- CA See Pic
15.29-08-2016Polics statiom roadSe sir inspection for thickness of beam of crash barrierAnkit NakotiAEUEAP- CA See Pic
16.29-08-2016Police station approach road chng +.075Se sir inspection checkin standpost thicknessAnkit NakotiAEUEAP- CA See Pic
17.29-08-2016Gic college roadInspection of se sir wbm thicknessAnkit NakotiAEUEAP- CA See Pic
18.29-08-2016Police statin aproach road chng 0.050Se sir inspection for wbmAnkit NakotiAEUEAP- CA See Pic
19.16-06-2016Animal hospital roadS.E. Sir inspection on site instructed for proper runoff of water from road surface and cross drainage to be constructedAnkit NakotiAEUEAP- CA See Pic
20.15-06-2016Animal hospital roadS.E.sir site inspectionAnkit NakotiAEUEAP- CA See Pic