Sub Project Profile Report

Project:  District: Package: Sub Project: 

Sub Project Profile Report

Haripur Ichari Kwanu Meenus Motor Road (Chronic Slip Zone) Agreement signed
Project: UEAP-RB UID: 5412 Sanction Cost: 992.00  lakh Length: 0.450 KM.
District: Dehradun Block: Chakrata Constituency: Chakrata Circle:
DEA: DEA UEAP Tehri DSC: TPF Getinsa Euroestudios S.L. DSC Scope: Design and Supervision Type: SH
Procurement:
Package No.: 1094        Package Name:  UEAP/PWD/C90        Tender Date: 11-09-2015        Current Status: Agreement signed        Achieved on Date: 11-04-2016

Construction Phase

Agreement Details
Bond/Agreement Name: UEAP/PWD/C90      Contractor Name: Pioneer Foundation Engineers
Start Date:  03-05-2016      Intended Completion Date:  31-08-2017      Original End Date:  02-03-2017
Total Bond Cost: 88846778.35 (888.47 lakh)        Variation Cost: 10347811.07 (103.48 lakh)    Hence Total Bond Cost is   99194589.42 (991.95 lakh) 
LD Analysis for Milestone1: calculated LD is Rs 4486723 for +101 days        LD Analysis for Milestone2: calculated LD is Rs 8040563 for 181 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakh)
Start Date End Date Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakh)
1.Hill side Cutting & Slip clearence0.58 KM223.7825-05-201631-08-20170.58 KM0.58 KM22.56223.78
2.R/Wall, B/ Wall Type Protection works1060.00 m725.4225-05-201631-08-20171060.00 m610.00 m42.09417.46
3.longitudinal Drain735.00 m38.1901-01-201731-08-2017735.00 m0.00 m00.00
4.Other Allied Works & Finishing Work 2.00 Job4.5624-08-201631-08-20172.00 Job1.00 Job0.232.28
Total Amount: 991.95 64.88   643.52
Remarks: No Remarks       Work Program Made On: 17-05-2017        Updation of work program on: 28-07-2017       
Work Program Status:Program Expired.
Financial Progress
SNo. Date Payment
1.30-August-201649.15  lakh
2.08-December-201626.07  lakh
3.28-January-201739.14  lakh
4.28-March-201736.54  lakh
5.04-May-2017271.71  lakh
6.09-June-201745.49  lakh
7.21-July-201723.62  lakh
8.28-September-201714.79  lakh
Total 506.51  lakh
% Payment 51.06 %
Advance Amount:  0.00  lakh        Recovered Amount:  0.00  lakh        Balance to be Recovered  0.00  lakh        * Advances are at package level not sub project level
Analysis:Bill sh ould be issued
Tracking Signal of Subproject.
Pending Environmental & Social issues
Environment & Social Compliances(Package level): No Pending Issue
Environment & Social Compliances(Sub Project level): debris disposal, Query
Detailed report of this subproject
Quality
Test Information not Available.
Quality Ranking in %: 95.00
Number of Notice(s) issued: 41

Mobile Pic Upload

Number of Pics Available on Web Repository: 20
( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.27-07-2017CH 30+850Site visit THDC eng. &AE sirVikas VermaJEUEAP R&B Tehri See Pic
2.27-07-2017CH 30+845Site visit thdc eng.Vikas VermaJEUEAP R&B Tehri See Pic
3.27-07-2017CH 30+790Site visit THDC eng. & AE sirVikas VermaJEUEAP R&B Tehri See Pic
4.27-07-2017CH-30+522Site Visit THDC Engg. &AE sirVikas VermaJEUEAP R&B Tehri See Pic
5.27-07-2017Ch 30+000Site visit C-90 THDC Eng.Vikas VermaJEUEAP R&B Tehri See Pic
6.27-04-2017CH 30+600AE sir site visitVikas VermaJEUEAP R&B Tehri See Pic
7.24-04-2017CH 30+520Installation of chain link fabric for shotcrete purposeVikas VermaJEUEAP R&B Tehri See Pic
8.15-04-2017CH 30+900CH 30+900Vikas VermaJEUEAP R&B Tehri See Pic
9.15-04-2017CH 30+900Site visit SE&RE sirVikas VermaJEUEAP R&B Tehri See Pic
10.15-04-2017CH 30+600Site visit SE &RE SirVikas VermaJEUEAP R&B Tehri See Pic
11.15-04-2017CH 30+600Site visit SE sir & REVikas VermaJEUEAP R&B Tehri See Pic
12.23-03-2017CH 31+000Site visit CE EE &AE sirVikas VermaJEUEAP R&B Tehri See Pic
13.23-03-2017CH 30+500Site visit CE EE & AE sirVikas VermaJEUEAP R&B Tehri See Pic
14.23-03-2017CH 30+500Site visit CE EE &AE sirVikas VermaJEUEAP R&B Tehri See Pic
15.23-03-2017CH- 30+500Site visit CE EE &AE sirVikas VermaJEUEAP R&B Tehri See Pic
16.09-03-2017CH-30+550Site visit THDC Engineers & EE SirVikas VermaJEUEAP R&B Tehri See Pic
17.09-03-2017CH 30+650Site visit EE & THDC EngineerVikas VermaJEUEAP R&B Tehri See Pic
18.09-03-2017CH- 30+750Site visit THDC Engineer &EE sirVikas VermaJEUEAP R&B Tehri See Pic
19.09-03-2017CH 30+600Site visit EE sirVikas VermaJEUEAP R&B Tehri See Pic
20.09-03-2017CH-30+800Site visit EE&THDC EngineersVikas VermaJEUEAP R&B Tehri See Pic