Steel Tuss Bridle Bridge over Khurmola Gard at Hayudai Tok Work Completed
Project: UDRP-AF(Bridge/Slope) UID: 4124 Sanction Cost: 143.04  lakh Span: 40.000 M
District: Uttarkashi Block: Dunda Constituency: Yamunotri Circle:
DEA: DEA Uttarkashi DSC: TPF Getinsa Euroestudios S.L. DSC Scope: Design and Supervision Type: Bridge
Procurement:
Package No.: 649        Package Name:  UDRP/AF/BR/82        Tender Date: 11-11-2019        Current Status: Agreement signed        Achieved on Date: 05-11-2020

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/AF/BR/82      Contractor Name: M/S Utsav Associate
Start Date:  21-11-2020      Intended Completion Date:  07-05-2022      Original End Date:  20-02-2022
Total Bond Cost: 12316116.71 (123.16 lakh)        Variation Cost: 2937755.87 (29.38 lakh)    Hence Total Bond Cost is   15253872.58 (152.54 lakh) 
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 2752626 for 447 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakh)
Start Date End Date Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakh)
1.Other Allied Works & Finishing Work 1.00 Job14.4521-11-202031-03-20221.00 Job1.00 Job13.1414.45
2.Foundation RHS1.00 Job0.3715-12-202003-01-20211.00 Job1.00 Job0.340.37
3.Foundation LHS1.00 Job0.3704-12-202027-12-20201.00 Job1.00 Job0.340.37
4.Abutment Superstructure RHS1.00 Job8.2108-01-202115-07-20211.00 Job1.00 Job7.478.21
5.Abutment Superstructure LHS1.00 Job8.2102-01-202115-07-20211.00 Job1.00 Job7.478.21
6.Steel Railing/crush barrier1.00 m8.0917-02-202228-02-20221.00 m1.00 m7.368.09
7.Approach Ramp /path 1.00 m31.0530-11-202128-03-20221.00 m1.00 m28.2431.05
8.Protection Work1.00 Job1.7704-05-202115-03-20221.00 Job1.00 Job1.611.77
9.Errection Work1.00 Job7.6412-10-202131-01-20221.00 Job1.00 Job6.957.64
10.Fabrication Work1.00 job26.8501-04-202130-09-20211.00 job1.00 job24.4226.85
11.Fixing Bearing/Slab Casting4.00 job2.9503-02-202215-02-20224.00 job4.00 job2.682.95
Total Amount: 109.96 100   109.96
Remarks: No Remarks       Work Program Made On: 29-01-2021        Updation of work program on: 24-05-2022       
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.28-June-202116.93  lakh
2.29-December-202127.23  lakh
3.31-March-202257.84  lakh
4.15-June-202223.00  lakh
5.20-October-202227.54  lakh
Total 152.54  lakh
% Payment 99.48 %
Advance Amount:  25.61  lakh        Recovered Amount:  25.61  lakh        Balance to be Recovered  0.00  lakh        * Advances are at package level not sub project level
Tracking Signal of Subproject.
Pending Environmental & Social issues
Environment & Social Compliances(Package level):
Environment & Social Compliances(Sub Project level):
Detailed report of this subproject
Quality
No. of Test Required : 386   No. of Test Done : 472    No. of Test Passed : 462   No. of Test Failed : 10   Test report of this package      * Tests Information is at package level not sub project level
Quality Ranking in %: 90.25
No Notice issued.

Mobile Pic Upload

Number of Pics Available on Web Repository: 18
( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.15-02-2022Hayundadi tok BR- 80M35 concrete casting is completed of 3rd lift of Abutment A2 sideAzad singh ` ` See Pic
2.17-07-2021BR/82A1cap concrete work in progress, concrete grade M35.Niraj pathakunknownunknown See Pic
3.17-07-2021BR/82Slump test on progress, concrete grade M35,A1,cap.Niraj pathakunknownunknown See Pic
4.04-05-2021Abutment A1 at hyundadi tok bridge.Abutment A 1 completed upto 9 lits at hyundadi tok bridge.Abhishek tiwari ` ` See Pic
5.04-05-2021Abutment A2 completed upto 9 lifts at hyundadi tok bridge in district Uttarkashi.Abutmemt A2 completed upto 9 lifts at hyundadi tok bridge in district Uttarkashi.Abhishek tiwari ` ` See Pic
6.06-04-2021BR/82/uttarkashi.Medical health checkup camp.Niraj pathakunknownunknown See Pic
7.06-04-2021BR/82/uttarkashi.Medical health checkup camp.Niraj pathakunknownunknown See Pic
8.06-04-2021BR/82/uttarkashi.Construction material testing work on progress.Niraj pathakunknownunknown See Pic
9.06-04-2021BR/82/uttarkashi.Cube testing work in progress,Niraj pathakunknownunknown See Pic
10.06-04-2021BR/82/uttarkashi.Fine aggregate gradation test on progress,Niraj pathakunknownunknown See Pic
11.06-04-2021BR/82/uttarkashi.Coarse aggregate gradation test on progress.Niraj pathakunknownunknown See Pic
12.05-04-2021Hyundadi tok,BR/82A1,,LHS,wall 5th lift concrete work in progress, concrete grade M/35/Niraj pathakunknownunknown See Pic
13.02-04-2021Hayundadi tok Abutment A1 4th lift readyBridge no 82Arun kumar ` ` See Pic
14.20-03-2021A1 Side 3rd liftA1 side 3 rd lift complete of khurmola gaad hyundadi tokANKIT KURIYAL ` ` See Pic
15.20-02-2021Reinforcement and shuttering checking at Br-82 kurmola gaad Abutment A2 1st liftAbutment A2 first lift reinforcement checking kurmola gaadArun kumar R.E ` ` See Pic
16.20-02-2021Hayundadi TokSieve analysis for first lift Abutment A2Azad Rana ` ` See Pic
17.20-02-2021Hayundadi TokLevel checking by Resident Engineer with DSC Team for Abutment A1Imteyaj Ansariunknownunknown See Pic
18.18-01-2021Hayundadi tok bridge no-82Survey and layoutDeepak PantSite supervisiorUDRP AF Irrigation birahi See Pic