Newgaon Sari Shrikalkhal Motor road phase1 Work Completed
Project: UDRP-RB UID: 3188 Sanction Cost: 37.36  lakh Length: 10.000 KM.
District: Uttarkashi Block: Dunda Constituency: Gangotri Circle: Rudraprayag WB Circle
DEA: DEA Uttarkashi DSC: Yongma Engineering Co. Ltd. DSC Scope: only Supervision Type: VR
Procurement:
Package No.: 2        Package Name:  UDRP/PWD/01/30/RD/002        Tender Date: 20-11-2014        Current Status: Agreement signed        Achieved on Date: 03-06-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/01/30/RD/002      Contractor Name: Vinod Kumar Chauhan
Start Date:  10-06-2015      Intended Completion Date:  09-09-2016     
Total Bond Cost: 18394419.74 (183.94 lakh)        Variation Cost: 1403503.13 (14.04 lakh)    Hence Total Bond Cost is   19797922.87 (197.98 lakh) 
Sub Project Cost: 39.00  lakh        Variation Cost of Sub Project: 53922.80  (0.54 lakh)       Total Sub Project Cost:   39.54 lakh
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: Ld Not applicable       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakh)
Start Date End Date Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakh)
1.R/Wall, B/ Wall Type Protection works273.00 m37.0701-07-201531-10-2015273.00 m273.00 m96.5737.07
2.Road Furniture58.00 No0.8301-09-201530-09-201558.00 No58.00 No2.170.83
3.Env. Man & Moni Plan1.00 Job0.4810-06-201509-09-20161.00 Job1.00 Job1.260.48
Total Amount: 38.38 100   38.38
Remarks: No Remarks       Work Program Made On: 02-09-2015        Updation of work program on: 16-10-2017       
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.21-August-20157.06  lakh
2.26-September-201516.00  lakh
3.30-September-20158.84  lakh
4.13-October-20153.62  lakh
5.09-November-20152.19  lakh
6.22-June-20160.77  lakh
Total 38.48  lakh
% Payment97.32 %
Advance Amount:  10.20  lakh        Recovered Amount:  10.20  lakh        Balance to be Recovered  0.00  lakh        * Advances are at package level not sub project level
Tracking Signal of Subproject.
Pending Environmental & Social issues
Environment & Social Compliances(Package level):
Environment & Social Compliances(Sub Project level):
Detailed report of this subproject
Quality
No. of Test Required : 321   No. of Test Done : 321    No. of Test Passed : 319   No. of Test Failed : 2   Test report of this package      * Tests Information is at package level not sub project level
Quality Ranking in %: 85.00
Number of Notice(s) issued: 2

Mobile Pic Upload

Number of Pics Available on Web Repository: 122
( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.20-10-2016Ch 1/18PC Work in progressNaveen Kumar SharmaAEUDRP R&B Karanprayag See Pic
2.19-06-2016Ch 9/38Culvert in progressNaveen Kumar SharmaAEUDRP R&B WB Karanprayag See Pic
3.13-06-20162/16G3 layerChandra Lal BhartiJEUDRP R&B Uttarkashi See Pic
4.13-06-20161/33G1+G2+G3 LayerChandra Lal BhartiJEUDRP R&B Uttarkashi See Pic
5.13-06-2016Laying of G30/26Chandra Lal BhartiJEUDRP R&B Uttarkashi See Pic
6.15-05-20160/11WbmChandra Lal BhartiJEUDRP R&B Uttarkashi See Pic
7.15-05-20160/11Test of WbmChandra Lal BhartiJEUDRP R&B Uttarkashi See Pic
8.05-05-20168/8material collection for G2Praveen GuptaREDSC1 R&B WB Uttarkashi See Pic
9.05-05-20160/25G2Chandra Lal BhartiJEUDRP R&B Uttarkashi See Pic
10.05-05-20167/38G1Chandra Lal BhartiJEUDRP R&B Uttarkashi See Pic
11.05-05-20168/8G3 collectionChandra Lal BhartiJEUDRP R&B Uttarkashi See Pic
12.28-04-2016Ch4/38WBM g2 gradation test on progressNeeraj PathakQCDSC1 R&B WB Uttarkashi See Pic
13.28-04-2016Ch4/39WBM G2 gradation test on progressNeeraj PathakQCDSC1 R&B WB Uttarkashi See Pic
14.28-04-2016Site labSilt contant checkingNeeraj PathakQCDSC1 R&B WB Uttarkashi See Pic
15.26-04-2016CH 1/37Sample collection for gradation test for G3Naveen Kumar SharmaAEUDRP R&B WB Karanprayag See Pic
16.25-04-20164/12G 3 thickness checkingPraveen GuptaREDSC1 R&B WB Uttarkashi See Pic
17.21-04-2016Ch1/37Wbm g3 samplingNeeraj PathakQCDSC1 R&B WB Uttarkashi See Pic
18.21-04-2016Ch9/29Hill side cutting checkingNeeraj PathakQCDSC1 R&B WB Uttarkashi See Pic
19.21-04-2016Ch4/12Wbm g3 thinkness checkingNeeraj PathakQCDSC1 R&B WB Uttarkashi See Pic
20.21-04-2016Ch1/40Wbm material checkingNeeraj PathakQCDSC1 R&B WB Uttarkashi See Pic