Project: UDRP-RB UID: 2511 Sanction Cost: 107.03  lakh Length: 1.500 KM.
District: Rudraprayag Block: Ukhimath Constituency: Kedarnath Circle: Rudraprayag WB Circle
DEA: DEA Guptkashi DSC: Yongma Engineering Co. Ltd. DSC Scope: only Supervision Type: VR
Procurement:
Package No.: 106        Package Name:  UDRP/PWD/03/RD/095        Tender Date: 04-07-2015        Current Status: Agreement signed        Achieved on Date: 03-10-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/03/RD/095      Contractor Name: Vinod Kumar Chauhan
Start Date:  10-10-2015      Intended Completion Date:  06-06-2017      Original End Date:  09-01-2017
Total Bond Cost: 55718387.81 (557.18 lakh)        Variation Cost: 9792705.36 (97.93 lakh)    Hence Total Bond Cost is   65511093.17 (655.11 lakh) 
Sub Project Cost: 79.08  lakh        Variation Cost of Sub Project: 1403055.73  (14.03 lakh)       Total Sub Project Cost:   93.11 lakh
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: Ld Not applicable       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakh)
Start Date End Date Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakh)
1.R/Wall, B/ Wall Type Protection works124.00 m8.2405-11-201530-05-2016124.00 m124.00 m8.848.24
2.GSB/RBI/G-11.50 KM11.5415-05-201630-06-20161.50 KM1.50 KM12.3811.54
3.G-21.50 KM9.0915-05-201631-08-20161.50 KM1.50 KM9.759.09
4.G-31.50 KM10.4815-05-201630-04-20171.50 KM1.50 KM11.2510.48
5.PC/CC i/c Prime Coat, Tack Coat1.50 KM19.3215-03-201710-05-20171.50 KM1.50 KM20.7319.32
6.Culverts/Scupper 1.00 No3.4810-12-201530-06-20161.00 No1.00 No3.733.48
7.longitudinal Drain1500.00 m9.1115-05-201630-09-20161500.00 m1500.00 m9.789.11
8.Crash Barrier257.00 m6.8501-01-201731-01-2017257.00 m257.00 m7.356.85
9.Parapet150.00 No1.9322-06-201631-01-2017150.00 No150.00 No2.071.93
10.Road Furniture7.00 No0.0601-01-201731-01-20177.00 No7.00 No0.060.06
11.Other Allied Works & Finishing Work 1.00 Job13.1001-01-201731-01-20171.00 Job1.00 Job14.0613.10
Total Amount: 93.2 100   93.2
Remarks: No Remarks       Work Program Made On: 17-11-2015        Updation of work program on: 20-05-2017       
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.28-March-20168.18  lakh
2.02-May-20165.73  lakh
3.18-May-20163.31  lakh
4.07-June-201615.72  lakh
5.28-June-20163.61  lakh
6.11-September-20165.65  lakh
7.24-October-201616.84  lakh
8.24-December-20166.41  lakh
9.30-March-20178.07  lakh
10.18-May-201727.76  lakh
11.27-July-20172.07  lakh
Total 103.35  lakh
% Payment111 %
Advance Amount:  4.54  lakh        Recovered Amount:  4.54  lakh        Balance to be Recovered  0.00  lakh        * Advances are at package level not sub project level
Analysis:Physical Progress Wrongly Reported.
Tracking Signal of Subproject.
Pending Environmental & Social issues
Environment & Social Compliances(Package level):
Environment & Social Compliances(Sub Project level):
Detailed report of this subproject
Quality
No. of Test Required : 316   No. of Test Done : 349    No. of Test Passed : 334   No. of Test Failed : 15   Test report of this package      * Tests Information is at package level not sub project level
Quality Ranking in %: 90.96
No Notice issued.

Mobile Pic Upload

Number of Pics Available on Web Repository: 28
( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.08-05-20171.000Premix carpet laying Bansu Tyuri Motor RoadSiddharth RangharJEUDRP R&B Guptkashi See Pic
2.08-05-20171.350Seal coat rolling under process Bansu TyuriSiddharth RangharJEUDRP R&B Guptkashi See Pic
3.05-05-20171.375Premix carpet laying Bansu Tyuri Motor RoadSiddharth RangharJEUDRP R&B Guptkashi See Pic
4.06-01-20171+025Cheking thickness of g3 by CE sir and EE sirAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
5.18-12-20161+470Site visit by E.E. and A.E. sir.Anurag DevJEUDRP R&B Guptkashi See Pic
6.20-11-20160+275R/bended wallAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
7.20-11-20160+150Kc drainAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
8.20-11-20160+125ParapetAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
9.20-11-20160+50Kc drainAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
10.20-11-20160+25KC drainAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
11.20-11-20160+250Dry wall with top RR 1:5Anurag Rawat AEAEUDRP R&B Guptkashi See Pic
12.20-11-20160+400Parapet, dry wall with top RR 1:5Anurag Rawat AEAEUDRP R&B Guptkashi See Pic
13.20-11-20161+050R/bended wallAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
14.20-11-20161+025R/ Bended wallAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
15.20-11-20160+975Breast wallAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
16.20-11-20160+925Breast wallAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
17.20-11-20160+900Breast wallAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
18.20-11-20160+850Breast wallAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
19.20-11-20160+325Kc drainAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
20.20-11-20160+150ParapetsAnurag Rawat AEAEUDRP R&B Guptkashi See Pic