Dadmandi Madanpur MR Work Completed
Project: UDRP-RB UID: 2277 Sanction Cost: 262.25  lakh Length: 5.000 KM.
District: Pauri Block: Dwarikhal Constituency: Yamkeshwar Circle:
DEA: DEA Pauri DSC: Egis International DSC Scope: Design and Supervision Type: VR
Procurement:
Package No.: 81        Package Name:  UDRP/PWD/06/71/RD/070        Tender Date: 28-01-2015        Current Status: Agreement signed        Achieved on Date: 14-08-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/06/71/RD/070      Contractor Name: Jeena Enterprises
Start Date:  21-08-2015      Intended Completion Date:  31-03-2017      Original End Date:  20-11-2016
Total Bond Cost: 20120406.75 (201.2 lakh)        Variation Cost: 3981004.64 (39.81 lakh)    Hence Total Bond Cost is   24101411.39 (241.01 lakh) 
LD Analysis for Milestone1: calculated LD is Rs 1237380 for 123 days        LD Analysis for Milestone2: calculated LD is Rs 935580 for 93 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakh)
Start Date End Date Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakh)
1.Hill side Cutting & Slip clearence2.85 KM8.1801-10-201531-01-20172.85 KM2.85 KM3.188.18
2.R/Wall, B/ Wall Type Protection works396.00 m54.9601-10-201531-01-2017396.00 m396.00 m21.3654.96
3.GSB/RBI/G-14.60 KM31.8301-02-201618-11-20164.60 KM4.60 KM12.3731.83
4.G-24.60 KM22.4915-05-201620-11-20164.60 KM4.60 KM8.7422.49
5.G-34.60 KM22.0801-08-201622-11-20164.60 KM4.60 KM8.5822.08
6.PC/CC i/c Prime Coat, Tack Coat4.63 KM46.0201-10-201615-12-20164.63 KM4.63 KM17.8846.02
7.Cause Way2.00 No17.9415-11-201628-02-20172.00 No2.00 No6.9717.94
8.Culverts/Scupper 13.00 No21.6101-10-201515-02-201713.00 No13.00 No8.421.61
9.longitudinal Drain4390.00 m13.5401-06-201628-02-20174390.00 m4390.00 m5.2613.54
10.Crash Barrier0.00 m0.0015-10-201615-10-20160.00 m0.00 m00.00
11.Parapet164.00 No4.4001-12-201628-02-2017164.00 No164.00 No1.714.40
12.Road Furniture59.00 No1.3001-12-201628-02-201759.00 No59.00 No0.511.30
13.Other Allied Works & Finishing Work 1.00 Job12.9901-12-201628-02-20171.00 Job1.00 Job5.0512.99
Total Amount: 257.34 100   257.34
Remarks: No Remarks       Work Program Made On: 06-05-2016        Updation of work program on: 14-08-2017       
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.30-January-20169.81  lakh
2.01-April-20168.96  lakh
3.13-May-201617.05  lakh
4.08-July-201628.16  lakh
5.16-August-201616.61  lakh
6.30-September-201624.11  lakh
7.27-October-201623.61  lakh
8.19-November-201632.37  lakh
9.31-January-201730.09  lakh
10.03-March-201729.28  lakh
11.30-June-201727.00  lakh
12.23-September-201710.14  lakh
Total 257.19  lakh
% Payment 106.7 %
Advance Amount:  48.28  lakh        Recovered Amount:  48.28  lakh        Balance to be Recovered  0.00  lakh        * Advances are at package level not sub project level
Tracking Signal of Subproject.
Pending Environmental & Social issues
Environment & Social Compliances(Package level):
Environment & Social Compliances(Sub Project level):
Detailed report of this subproject
Quality
No. of Test Required : 150   No. of Test Done : 161    No. of Test Passed : 150   No. of Test Failed : 11   Test report of this package      * Tests Information is at package level not sub project level
Quality Ranking in %: 89.82
Number of Notice(s) issued: 103

Mobile Pic Upload

Number of Pics Available on Web Repository: 46
( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.10-04-20171+050Road furniture work completeDeepak GoelREDSC2 R&B WB Pauri See Pic
2.10-04-20170+450Parapet construction completedDeepak GoelREDSC2 R&B WB Pauri See Pic
3.06-04-20170+900Road work complete. With reflected sogn boardSagar KumarJEUDRP R&B Pauri See Pic
4.08-03-20170/6EMP implementation training by Environmental Expert of Egis India.Deepak GoelREDSC2 R&B WB Pauri See Pic
5.13-11-20161+550laying of PCNoshad QureshiSite SupervisorDSC2 R&B WB Pauri See Pic
6.13-11-20161+550laying of PCNoshad QureshiSite SupervisorDSC2 R&B WB Pauri See Pic
7.13-11-20161+700laying of PCNoshad QureshiSite SupervisorDSC2 R&B WB Pauri See Pic
8.28-10-2016Ch 1+250Inspection of PC laying by SE WB PWD RudraprayagDeepak GoelREDSC2 R&B WB Pauri See Pic
9.28-10-2016Ch 0+850Inspection of work by SE WB PWD RudraprayagDeepak GoelREDSC2 R&B WB Pauri See Pic
10.10-10-2016KM 3.925Checking of road width at bendDeepak GoelREDSC2 R&B WB Pauri See Pic
11.10-10-20163.700Checking of super elevationDeepak GoelREDSC2 R&B WB Pauri See Pic
12.10-10-20163+700checking of super elevation by RE sirNoshad QureshiSite SupervisorDSC2 R&B WB Pauri See Pic
13.22-09-2016Ch 0+600Visit of SE, WB PWDDeepak GoelREDSC2 R&B WB Pauri See Pic
14.22-09-20160+600H/S cuttingDeepak GoelREDSC2 R&B WB Pauri See Pic
15.30-06-20163+970G-2 LayingSagar KumarJEUDRP R&B Pauri See Pic
16.20-06-2016Hill side cutting 0+700Hill side cuttingSagar KumarJEUDRP R&B Pauri See Pic
17.06-05-2016G-1laying checking, visited by EE sir( Sh. MM Kala), AE Sir(Sh. PK Chamoli)Ch 3+180Sagar KumarJEUDRP R&B Pauri See Pic
18.24-04-20163+670G-1 layingSagar KumarJEUDRP R&B Pauri See Pic
19.14-04-20164+400 G-1 LayingG1 laying GPS accuracy is 3000MSagar KumarJEUDRP R&B Pauri See Pic
20.04-03-20163+600 scupperScupper slab castingSagar KumarJEUDRP R&B Pauri See Pic