Menu

Sub Project Profile Report

Project:  District: Package: Sub Project: 

Sub Project Profile Report

Lolti - Malbajwad Motor Road Work Completed
Project: UDRP-RB UID: 1253 Sanction Cost: 373.08  lakh Length: 6.000 KM.
District: Chamoli Block: Tharali Constituency: Tharali Circle: Rudraprayag WB Circle
DEA: DEA Gopeshwar DSC: Yongma Engineering Co. Ltd. DSC Scope: only Supervision Type: VR
Procurement:
Package No.: 108        Package Name:  UDRP/PWD/02/RD/097        Tender Date: 27-06-2015        Current Status: Agreement signed        Achieved on Date: 11-09-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/02/RD/097      Contractor Name: Sansun Contractors Pvt. Ltd.
Start Date:  18-09-2015      Intended Completion Date:  25-06-2017      Original End Date:  17-12-2016
Total Bond Cost: 74543585.76 (745.44 lakh)        Variation Cost: 18843460.57 (188.43 lakh)    Hence Total Bond Cost is   93387046.33 (933.87 lakh) 
Sub Project Cost: 286.17  lakh        Variation Cost of Sub Project: 4870366.49  (48.7 lakh)       Total Sub Project Cost:   334.87 lakh
LD Analysis for Milestone1: calculated LD is Rs 2459952 for 66 days        LD Analysis for Milestone2: calculated LD is Rs 3689928 for 99 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakh)
Start Date End Date Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakh)
1.Hill side Cutting & Slip clearence3.50 KM14.2022-10-201525-03-20173.50 KM3.50 KM5.7714.20
2.R/Wall, B/ Wall Type Protection works891.00 m57.9020-10-201508-03-2017891.00 m891.00 m23.5157.90
3.G-22.00 KM10.7809-02-201625-10-20162.00 KM2.00 KM4.3810.78
4.G-32.50 KM19.5024-02-201602-12-20162.50 KM2.50 KM7.9219.50
5.PC/CC i/c Prime Coat, Tack Coat6.00 KM76.7102-04-201625-05-20176.00 KM6.00 KM31.1476.71
6.Cause Way4.00 No10.1724-11-201515-03-20174.00 No4.00 No4.1310.17
7.Culverts/Scupper 16.00 No1.9014-01-201608-03-201716.00 No16.00 No0.771.90
8.longitudinal Drain6000.00 m47.4822-01-201626-05-20176000.00 m6000.00 m19.2847.48
9.Crash Barrier100.00 m1.6102-01-201714-06-2017100.00 m100.00 m0.661.61
10.Parapet166.00 No3.7218-01-201727-05-2017166.00 No166.00 No1.513.72
11.Road Furniture218.00 No2.3425-10-201614-06-2017218.00 No218.00 No0.952.34
Total Amount: 246.31 100   246.31
Remarks: No Remarks       Work Program Made On: 25-09-2015        Updation of work program on: 24-05-2017       
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.24-December-20158.31  lakh
2.25-January-20166.58  lakh
3.04-March-201628.61  lakh
4.31-March-20166.65  lakh
5.03-May-201622.27  lakh
6.30-June-201660.33  lakh
7.18-October-201616.55  lakh
8.26-October-201637.21  lakh
9.17-December-201614.35  lakh
10.09-March-201711.12  lakh
11.23-March-201730.10  lakh
12.27-November-201744.76  lakh
13.17-February-201845.62  lakh
14.13-September-20181.94  lakh
Total 334.4  lakh
% Payment99.86 %
Advance Amount:  25.00  lakh        Recovered Amount:  0.00  lakh        Balance to be Recovered  25.00  lakh        * Advances are at package level not sub project level
Analysis:Physical Progress Wrongly Reported.
Tracking Signal of Subproject.
Pending Environmental & Social issues
Environment & Social Compliances(Package level):
Environment & Social Compliances(Sub Project level):
Detailed report of this subproject
Quality
No. of Test Required : 300   No. of Test Done : 301    No. of Test Passed : 255   No. of Test Failed : 46   Test report of this package      * Tests Information is at package level not sub project level
Quality Ranking in %: 90.00
No Notice issued.

Mobile Pic Upload

Number of Pics Available on Web Repository: 55
( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.21-01-20175.780Preparation for subgradeAshwani KumarREDSC4 R&B WB Chamoli See Pic
2.21-01-20171.4755.00 M span culvert work in progressAshwani KumarREDSC4 R&B WB Chamoli See Pic
3.05-01-20175900Footpath for villegersVikash SinghJEUDRP R&B Gopeshwar See Pic
4.05-01-20175975B/WVikash SinghJEUDRP R&B Gopeshwar See Pic
5.05-01-20175840Wire crateVikash SinghJEUDRP R&B Gopeshwar See Pic
6.19-12-20161.500Lolti malbajwab moter road layout of 6.0 m span culvertVikash SinghJEUDRP R&B Gopeshwar See Pic
7.19-12-20161.5105.m.span.calvartAjay Narayan PandeyREDSC1 R&B WB Chamoli See Pic
8.10-10-20160.900Providing and applying tack coat with bitumen emulsion RS-1Vikash SinghJEUDRP R&B Gopeshwar See Pic
9.10-10-20163.000Bitument content test at lolti kasbinagar M/RVikash SinghJEUDRP R&B Gopeshwar See Pic
10.27-09-20161900Thickness checking of pucca drainVikash SinghJEUDRP R&B Gopeshwar See Pic
11.09-09-20165.675Checking Road widthVikash SinghJEUDRP R&B Gopeshwar See Pic
12.09-09-20165.890R/W already rejected but contractor is not dismental the till dateVikash SinghJEUDRP R&B Gopeshwar See Pic
13.02-09-20160.375Pucca drain work in progressVikash SinghJEUDRP R&B Gopeshwar See Pic
14.13-08-20160.750Tree Plantation at lolti malbajwab M/RVikash SinghJEUDRP R&B Gopeshwar See Pic
15.08-08-2016CH 0.600Tree plantation at lolti malbajwad M/RVikash SinghJEUDRP R&B Gopeshwar See Pic
16.08-08-2016CH 0 .400Tree plantation at lolti malbajwad M/RVikash SinghJEUDRP R&B Gopeshwar See Pic
17.08-08-2016CH 0.400Tree Plantation at lolti malbajwad M/RVikash SinghJEUDRP R&B Gopeshwar See Pic
18.08-08-2016CH 0300Tree Plantation lolti malbajwad RoadVikash SinghJEUDRP R&B Gopeshwar See Pic
19.08-08-2016CH200Tree Plantation Lolti Malbajwad M/RVikash SinghJEUDRP R&B Gopeshwar See Pic
20.08-08-2016CH 0150Tree Plantation at Lolti Malbajwad RoadVikash SinghJEUDRP R&B Gopeshwar See Pic