1 |
Expenditure in (Rs.) |
122585000.00 | 122585293.08 |
2 |
Hill side Cutting & Slip clearence in (KM) |
4.00 | 4.00 |
3 |
R/Wall, B/ Wall Type Protection works in (m) |
950.00 | 950.00 |
4 |
GSB/RBI/G-1 in (KM) |
0.12 | 0.12 |
5 |
G-2 in (KM) |
0.12 | 0.12 |
6 |
G-3 in (KM) |
5.54 | 5.54 |
7 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
0.90 | 0.90 |
8 |
BM i/c Prime Coat, Tack Coat in (KM) |
18.87 | 18.87 |
9 |
SDBC i/c Tackcoat in (KM) |
23.12 | 23.12 |
10 |
Cause Way in (No) |
17.00 | 17.00 |
11 |
Culverts/Scupper in (No) |
16.00 | 16.00 |
12 |
longitudinal Drain in (m) |
23120.00 | 23120.00 |
13 |
Crash Barrier in (m) |
3360.00 | 3360.00 |
14 |
Parapet in (No) |
650.00 | 650.00 |
15 |
Road Furniture in (No) |
75.00 | 75.00 |
16 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 1.00 |
17 |
Quality in (%) |
90 | |