1 |
Expenditure in (Rs.) |
142354000.00 | 31763467.42 |
2 |
Hill side Cutting & Slip clearence in (KM) |
6.00 | 6.00 |
3 |
R/Wall, B/ Wall Type Protection works in (m) |
500.00 | 500.00 |
4 |
G-2 in (KM) |
0.00 | 0.00 |
5 |
G-3 in (KM) |
5.50 | 5.50 |
6 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
6.30 | 6.30 |
7 |
BM i/c Prime Coat, Tack Coat in (KM) |
0.00 | 0.00 |
8 |
SDBC i/c Tackcoat in (KM) |
0.00 | 0.00 |
9 |
Cause Way in (No) |
4.00 | 4.00 |
10 |
Culverts/Scupper in (No) |
2.00 | 2.00 |
11 |
longitudinal Drain in (m) |
7700.00 | 7700.00 |
12 |
Crash Barrier in (m) |
1200.00 | 1200.00 |
13 |
Parapet in (No) |
120.00 | 120.00 |
14 |
Road Furniture in (No) |
55.00 | 55.00 |
15 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 1.00 |
16 |
Quality in (%) |
90.01 | |