1 |
Expenditure in (Rs.) |
267296000.00 | 184197531.08 |
2 |
Hill side Cutting & Slip clearence in (KM) |
6.00 | 6.00 |
3 |
R/Wall, B/ Wall Type Protection works in (m) |
2700.00 | 2700.00 |
4 |
GSB/RBI/G-1 in (KM) |
0.05 | 0.05 |
5 |
G-2 in (KM) |
3.80 | 3.80 |
6 |
G-3 in (KM) |
13.10 | 13.10 |
7 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
11.90 | 11.90 |
8 |
BM i/c Prime Coat, Tack Coat in (KM) |
33.65 | 33.65 |
9 |
SDBC i/c Tackcoat in (KM) |
35.15 | 35.15 |
10 |
Cause Way in (No) |
10.00 | 10.00 |
11 |
Culverts/Scupper in (No) |
32.00 | 32.00 |
12 |
longitudinal Drain in (m) |
36660.00 | 36660.00 |
13 |
Crash Barrier in (m) |
3440.00 | 3440.00 |
14 |
Parapet in (No) |
2000.00 | 2000.00 |
15 |
Road Furniture in (No) |
70.00 | 70.00 |
16 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 1.00 |
17 |
Quality in (%) |
88.33 | |