S.No. Progress Component Total Target Total Achievement
1 Expenditure in (Rs.) 31814000.0031814173.00
2 Hill side Cutting & Slip clearence in (KM) 4.004.00
3 R/Wall, B/ Wall Type Protection works in (m) 300.00300.00
4 GSB/RBI/G-1 in (KM) 4.004.00
5 G-2 in (KM) 4.004.00
6 G-3 in (KM) 4.004.00
7 PC/CC i/c Prime Coat, Tack Coat in (KM) 5.755.75
8 Cause Way in (No) 3.003.00
9 Culverts/Scupper in (No) 2.002.00
10 longitudinal Drain in (m) 5898.005898.00
11 Crash Barrier in (m) 200.00200.00
12 Other Allied Works & Finishing Work in (Job) 1.001.00
13 Quality in (%) 90.34