1 |
Expenditure in (Rs.) |
66277000.00 | 46212101.00 |
2 |
Hill side Cutting & Slip clearence in (KM) |
2.10 | 0.00 |
3 |
R/Wall, B/ Wall Type Protection works in (m) |
482.00 | 417.00 |
4 |
GSB/RBI/G-1 in (KM) |
0.90 | 0.76 |
5 |
G-2 in (KM) |
0.90 | 0.76 |
6 |
G-3 in (KM) |
1.30 | 0.96 |
7 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
1.73 | 0.00 |
8 |
BM i/c Prime Coat, Tack Coat in (KM) |
5.53 | 2.01 |
9 |
SDBC i/c Tackcoat in (KM) |
7.35 | 4.34 |
10 |
Cause Way in (No) |
1.00 | 0.00 |
11 |
Culverts/Scupper in (No) |
4.00 | 0.00 |
12 |
longitudinal Drain in (m) |
1000.00 | 790.00 |
13 |
Crash Barrier in (m) |
200.00 | 0.00 |
14 |
Road Furniture in (No) |
234.00 | 103.00 |
15 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 0.00 |
16 |
Quality in (%) |
85.11 | |