1 |
Expenditure in (Rs.) |
213864000.00 | 177257163.00 |
2 |
Hill side Cutting & Slip clearence in (KM) |
1.51 | 0.69 |
3 |
R/Wall, B/ Wall Type Protection works in (m) |
2265.00 | 1215.00 |
4 |
GSB/RBI/G-1 in (KM) |
0.58 | 0.50 |
5 |
G-2 in (KM) |
5.73 | 5.73 |
6 |
G-3 in (KM) |
9.16 | 9.16 |
7 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
0.50 | 0.00 |
8 |
BM i/c Prime Coat, Tack Coat in (KM) |
43.00 | 33.60 |
9 |
SDBC i/c Tackcoat in (KM) |
43.00 | 33.00 |
10 |
Cause Way in (No) |
35.00 | 22.00 |
11 |
Culverts/Scupper in (No) |
10.00 | 5.00 |
12 |
longitudinal Drain in (m) |
9585.00 | 9585.00 |
13 |
Crash Barrier in (m) |
1894.00 | 0.00 |
14 |
Parapet in (No) |
430.00 | 0.00 |
15 |
Road Furniture in (No) |
2066.00 | 0.00 |
16 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 0.00 |
17 |
Quality in (%) |
88.66 | |