1 |
Expenditure in (Rs.) |
326557000.00 | 279893254.00 |
2 |
Hill side Cutting & Slip clearence in (KM) |
1.89 | 1.20 |
3 |
R/Wall, B/ Wall Type Protection works in (m) |
2341.00 | 1360.00 |
4 |
GSB/RBI/G-1 in (KM) |
0.59 | 0.00 |
5 |
G-2 in (KM) |
1.25 | 0.70 |
6 |
G-3 in (KM) |
7.83 | 3.02 |
7 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
0.53 | 0.00 |
8 |
BM i/c Prime Coat, Tack Coat in (KM) |
25.34 | 25.34 |
9 |
SDBC i/c Tackcoat in (KM) |
80.00 | 73.00 |
10 |
Cause Way in (No) |
42.00 | 15.00 |
11 |
Culverts/Scupper in (No) |
40.00 | 8.00 |
12 |
longitudinal Drain in (m) |
67655.00 | 45050.00 |
13 |
Crash Barrier in (m) |
3867.00 | 1354.00 |
14 |
Parapet in (No) |
160.00 | 50.00 |
15 |
Road Furniture in (No) |
4571.00 | 662.00 |
16 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 0.00 |
17 |
Quality in (%) |
86.88 | |