1 |
Expenditure in (Rs.) |
65917000.00 | 67103050.00 |
2 |
Env. Man & Moni Plan in (Job) |
33.00 | 33.00 |
3 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 0.00 |
4 |
Pile Cap in (No) |
1.00 | 0.00 |
5 |
Group of Pile in (No) |
1.00 | 1.00 |
6 |
Foundation RHS in (Job) |
1.00 | 1.00 |
7 |
Foundation LHS in (Job) |
1.00 | 1.00 |
8 |
Steel Railing/crush barrier in (m) |
452.40 | 0.00 |
9 |
Approach Ramp /path in (m) |
100.00 | 0.00 |
10 |
Protection Work in (Job) |
3.00 | 0.00 |
11 |
Errection Work in (Job) |
1.00 | 0.00 |
12 |
PCC in Foundation in (cum) |
30.17 | 30.17 |
13 |
Excavation in soil in (cum) |
914.21 | 900.00 |
14 |
Fabrication Work in (job) |
1.00 | 1.00 |
15 |
Abutment Substructure RHS in (Job) |
1.00 | 1.00 |
16 |
Abutment Substructure LHS in (Job) |
1.00 | 1.00 |
17 |
Fixing Bearing/Slab Casting in (job) |
8.00 | 0.00 |
18 |
Back Wall/ Approach slab in (job) |
1.00 | 0.00 |
19 |
Well-Abutments/Pier/Shafts/Caps in (job) |
1.00 | 0.00 |
20 |
Wearing Coat in (Cum) |
3.75 | 0.00 |
21 |
Quality in (%) |
94.5 | |