1 |
Expenditure in (Rs.) |
47214000.00 | 42363509.00 |
2 |
R/Wall, B/ Wall Type Protection works in (m) |
125.00 | 125.00 |
3 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
1.00 | 1.00 |
4 |
Parapet in (No) |
258.00 | 258.00 |
5 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 1.00 |
6 |
Foundation RHS in (Job) |
1.00 | 1.00 |
7 |
Foundation LHS in (Job) |
1.00 | 1.00 |
8 |
Abutment Superstructure RHS in (Job) |
1.00 | 1.00 |
9 |
Abutment Superstructure LHS in (Job) |
1.00 | 1.00 |
10 |
Steel Railing/crush barrier in (m) |
87.40 | 87.40 |
11 |
Approach Ramp /path in (m) |
105.00 | 105.00 |
12 |
Protection Work in (Job) |
1.00 | 1.00 |
13 |
Errection Work in (Job) |
1.00 | 1.00 |
14 |
Gabion work in (m) |
250.00 | 250.00 |
15 |
Fabrication Work in (job) |
1.00 | 1.00 |
16 |
Fixing Bearing/Slab Casting in (job) |
1.00 | 1.00 |
17 |
Back Wall/ Approach slab in (job) |
1.00 | 1.00 |
18 |
Quality in (%) |
90 | |