1 |
Expenditure in (Rs.) |
21074000.00 | 21073817.00 |
2 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 1.00 |
3 |
Foundation RHS in (Job) |
1.00 | 1.00 |
4 |
Foundation LHS in (Job) |
1.00 | 1.00 |
5 |
Steel Railing/crush barrier in (m) |
62.40 | 62.40 |
6 |
Approach Ramp /path in (m) |
100.00 | 100.00 |
7 |
Protection Work in (Job) |
1.00 | 1.00 |
8 |
Errection Work in (Job) |
1.00 | 1.00 |
9 |
PCC in Foundation in (cum) |
12.58 | 12.58 |
10 |
Fabrication Work in (job) |
1.00 | 1.00 |
11 |
Abutment Substructure RHS in (Job) |
1.00 | 1.00 |
12 |
Abutment Substructure LHS in (Job) |
1.00 | 1.00 |
13 |
Fixing Bearing/Slab Casting in (job) |
1.00 | 1.00 |
14 |
Back Wall/ Approach slab in (job) |
1.00 | 1.00 |
15 |
Wearing Coat in (Cum) |
9.95 | 9.95 |
16 |
Quality in (%) |
91 | |