1 |
Expenditure in (Rs.) |
161343000.00 | 145073133.00 |
2 |
GSB/RBI/G-1 in (KM) |
0.75 | 0.75 |
3 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
0.75 | 0.75 |
4 |
Env. Man & Moni Plan in (Job) |
1.00 | 1.00 |
5 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 1.00 |
6 |
Steel Railing/crush barrier in (m) |
0.20 | 0.20 |
7 |
Gravity Bench Wall in (m) |
364.00 | 364.00 |
8 |
Anchors in (m) |
4963.33 | 4963.33 |
9 |
Gabion work in (m) |
7151.50 | 7151.50 |
10 |
PCC in Foundation in (cum) |
6611.13 | 6611.13 |
11 |
Excavation in soil in (cum) |
9229.89 | 9229.89 |
12 |
Quality in (%) |
82.84 | |