1 |
Expenditure in (Rs.) |
255149000.00 | 227810961.00 |
2 |
GSB/RBI/G-1 in (KM) |
0.40 | 0.40 |
3 |
PC/CC i/c Prime Coat, Tack Coat in (KM) |
0.40 | 0.40 |
4 |
Stressing & Grouting in (Job) |
1.00 | 1.00 |
5 |
Env. Man & Moni Plan in (Job) |
1.00 | 1.00 |
6 |
Other Allied Works & Finishing Work in (Job) |
1.00 | 1.00 |
7 |
Steel Railing/crush barrier in (m) |
40.00 | 40.00 |
8 |
Gravity Bench Wall in (m) |
1725.25 | 1725.25 |
9 |
Anchors in (m) |
26695.58 | 26695.58 |
10 |
Hydroseeding,3-D Net, High tensile Rolled Cable Net in (sqm) |
47200.00 | 47200.00 |
11 |
Gabion work in (m) |
1837.00 | 1837.00 |
12 |
PCC in Foundation in (cum) |
6516.63 | 6516.63 |
13 |
Excavation in soil in (cum) |
13177.26 | 13177.26 |
14 |
Quality in (%) |
86.13 | |