S.No. Progress Component Total Target Total Achievement
1 Expenditure in (Rs.) 57784000.0057725361.00
2 R/Wall, B/ Wall Type Protection works in (m) 2005.002005.00
3 GSB/RBI/G-1 in (KM) 1.321.32
4 G-2 in (KM) 1.741.74
5 G-3 in (KM) 3.553.55
6 PC/CC i/c Prime Coat, Tack Coat in (KM) 9.009.00
7 Cause Way in (No) 2.002.00
8 Culverts/Scupper in (No) 26.0026.00
9 longitudinal Drain in (m) 10900.0010900.00
10 Road Furniture in (No) 63.0063.00
11 Quality in (%) 89.82