S.No. Progress Component Total Target Total Achievement
1 Expenditure in (Rs.) 28617000.0033440086.00
2 Hill side Cutting & Slip clearence in (KM) 3.503.50
3 R/Wall, B/ Wall Type Protection works in (m) 891.00891.00
4 G-2 in (KM) 2.002.00
5 G-3 in (KM) 2.502.50
6 PC/CC i/c Prime Coat, Tack Coat in (KM) 6.006.00
7 Cause Way in (No) 4.004.00
8 Culverts/Scupper in (No) 16.0016.00
9 longitudinal Drain in (m) 6000.006000.00
10 Crash Barrier in (m) 100.00100.00
11 Parapet in (No) 166.00166.00
12 Quality in (%) 90