S.No. Progress Component Total Target Total Achievement
1 Expenditure in (Rs.) 158746000.00152126712.00
2 R/Wall, B/ Wall Type Protection works in (m) 5588.005588.00
3 GSB/RBI/G-1 in (KM) 7.397.39
4 G-3 in (KM) 11.0011.00
5 PC/CC i/c Prime Coat, Tack Coat in (KM) 32.5032.50
6 Culverts/Scupper in (No) 68.0068.00
7 longitudinal Drain in (m) 32500.0032500.00
8 Crash Barrier in (m) 602.00602.00
9 Road Furniture in (No) 410.00410.00
10 Quality in (%) 85