S.No. Progress Component Total Target Total Achievement
1 Expenditure in (Rs.) 97262000.0097896190.00
2 R/Wall, B/ Wall Type Protection works in (m) 1288.001288.00
3 GSB/RBI/G-1 in (KM) 4.814.81
4 G-3 in (KM) 13.4013.40
5 PC/CC i/c Prime Coat, Tack Coat in (KM) 15.1015.10
6 Cause Way in (No) 1.001.00
7 Culverts/Scupper in (No) 29.0029.00
8 longitudinal Drain in (m) 12468.0012468.00
9 Crash Barrier in (m) 2230.002230.00
10 Parapet in (No) 390.00390.00
11 Other Allied Works & Finishing Work in (Job) 1.001.00
12 Quality in (%) 88.16