Package Profile Report

UDRP/AF/SL/12 Agreement signed
Project: UDRP-AF(Bridge/Slope) Package No.: 709 Package Name: UDRP/AF/SL/12 Sanction Cost: 612.54  lakhs
District: Tehri Block: Narendra Nagar Constituency: Narendra Nagar Circle:
DEA: DEA Tehri DSC: CCEE Group India Pvt. Ltd in Association with JSV DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  4051   Tachla Naur Slope Motor Road KM-1 (150.000 KM.) (completed)
Procurement:
Package No.: 709        Package Name: UDRP/AF/SL/12        Tender Date: 11-11-2019        Current Status: Agreement signed        Achieved on Date: 02-06-2020

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/AF/SL/12        Contractor Name: Global Construction       
Start Date: 09-07-2020        Intended Completion Date: 06-09-2021        Original End Date:  08-07-2021
Total Bond Cost: 54390157.29 (543.9 lakhs)        Variation Cost: 181827.89 (1.82 lakhs)     Hence Total Bond Cost is   54571985.18 (545.72 lakhs) 
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 7152285 for 263 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.R/Wall, B/ Wall Type Protection works221.00 m38.20221.00 m221.00 m7.9538.20
2.Stressing & Grouting1.00 Job226.871.00 Job1.00 Job47.19226.87
3.Env. Man & Moni Plan1.00 Job4.731.00 Job1.00 Job0.984.73
4.Other Allied Works & Finishing Work 1.00 Job18.091.00 Job1.00 Job3.7618.09
5.Approach Ramp /path 150.00 m22.41150.00 m150.00 m4.6622.41
6.Anchors8739.00 m36.678739.00 m8739.00 m7.6336.67
7.Hydroseeding,3-D Net, High tensile Rolled Cable Net8250.00 sqm122.438250.00 sqm8250.00 sqm25.47122.43
8.Gabion work150.00 m11.36150.00 m150.00 m2.3611.36
Total Amount: 480.76 100   480.76
Remarks: No Remarks       Work Program Made On: 21-10-2020       Updation of work program on: 21-09-2021      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.11-November-202071.52  lakhs
2.18-December-2020137.01  lakhs
3.04-February-202136.12  lakhs
4.27-February-202139.14  lakhs
5.31-May-202133.93  lakhs
6.06-July-202164.23  lakhs
7.31-August-202168.64  lakhs
8.30-September-202146.85  lakhs
9.22-February-202248.08  lakhs
Total 545.52  lakhs
% Payment 99.96 %
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 347     No. of Test Done : 347      No. of Test Passed : 347      No. of Test Failed : 0   Test report of this package
Number of Pics Available on Web Repository: 348
Number of Notice(s) issued: 5

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.06-04-2022Tachhla Naur km 1World Bank Team visitSudhir Kumar ` ` See Pic
2.06-04-2022Tachhla Naur km 1World Bank Team visitSudhir Kumar ` ` See Pic
3.06-04-2022Tachhla Naur km 1World Bank Team visitSudhir Kumar ` ` See Pic
4.28-01-20220+85R/wall at sub project.Sohan Negi ` ` See Pic
5.27-01-20220+095 to 0+130White washing for parapet & B/wallSohan negi ` ` See Pic
6.27-01-20220+070Soil Erosion control Coir mat.Sohan Negi ` ` See Pic
7.27-01-20220+025Installation of PVC pipe for drainage out of seepage area water.Sohan Negi ` ` See Pic
8.27-01-20220+110Breast wall protection at sub projectSohan Negi ` ` See Pic
9.27-01-20220+055Breast wall protection at sub projectSohan Negi ` ` See Pic
10.27-01-20220+000Rigid pavement CC roadSohan Negi ` ` See Pic
11.27-01-20220+040Parapet protectionSohan Negi ` ` See Pic
12.27-01-20220+00Road and wire mesh protectionRajveer Tomar ` ` See Pic
13.27-01-202200+00Wire mesh protectionRajveer Tomar ` ` See Pic
14.27-01-202200+00Wire mesh protectionRajveer Tomar ` ` See Pic
15.27-01-20220+085to0+110Retaining wall in progressRajveer Tomar ` ` See Pic
16.27-01-20220+000Slope protection work with high tensile wire mesh, Anchoring and anchor platesSohan Negi ` ` See Pic
17.27-01-20220+00 to 0+80High tensile wire mesh work in progressRajveer Tomar ` ` See Pic
18.27-01-20220+080To0+110Retaining wall in progressRajveer Tomar ` ` See Pic
19.27-01-20220+090to0+110Retaining wall in progressRajveer Tomar ` ` See Pic
20.12-11-2021Tachhla Naur km 1 TehriJoint inspection with AE PWD Narendra NagarSudhir Kumar ` ` See Pic