Package Profile Report

                            Project:               District:               Package: 

Package Profile Report

UDRP/PWD/03/29/RD/059 Agreement signed
Project: UDRP-RB Package No.: 69 Package Name: UDRP/PWD/03/29/RD/059 Sanction Cost: 250.13  lakhs
District: Rudraprayag Block: Jakholi Constituency: Rudraprayag Circle: Rudraprayag WB Circle
DEA: DEA Guptkashi DSC: Yongma Engineering Co. Ltd. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  2542   Sirain-Chaura- Bhatwari Motor Road (3.000 KM.) (completed)
Procurement:
Package No.: 69        Package Name: UDRP/PWD/03/29/RD/059        Tender Date: 24-12-2014        Current Status: Agreement signed        Achieved on Date: 21-07-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/03/29/RD/059        Contractor Name: Tushar Builders       
Start Date: 28-07-2015        Intended Completion Date: 27-12-2016        Original End Date:  27-10-2016
Total Bond Cost: 20737723.9 (207.38 lakhs)        Variation Cost: 4275136.46 (42.75 lakhs)     Hence Total Bond Cost is   25012860.36 (250.13 lakhs) 
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 207380 for 20 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Hill side Cutting & Slip clearence3.00 KM9.603.00 KM3.00 KM4.639.60
2.R/Wall, B/ Wall Type Protection works830.00 m47.51830.00 m830.00 m22.9147.51
3.G-26.60 KM33.456.60 KM6.60 KM16.1333.45
4.G-33.30 KM21.833.30 KM3.30 KM10.5321.83
5.PC/CC i/c Prime Coat, Tack Coat3.30 KM35.683.30 KM3.30 KM17.2135.68
6.Cause Way4.00 No2.794.00 No4.00 No1.352.79
7.Culverts/Scupper 11.00 No27.9511.00 No11.00 No13.4827.95
8.Crash Barrier100.00 m2.20100.00 m100.00 m1.062.20
9.Parapet300.00 No8.98300.00 No300.00 No4.338.98
10.Road Furniture82.00 No0.5282.00 No82.00 No0.250.52
11.Other Allied Works & Finishing Work 1.00 Job16.861.00 Job1.00 Job8.1316.86
Total Amount: 207.37 100   207.37
Remarks: No Remarks       Work Program Made On: 29-09-2015       Updation of work program on: 19-05-2017      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.24-September-201532.21  lakhs
2.22-December-201513.04  lakhs
3.29-February-201626.14  lakhs
4.29-June-201635.76  lakhs
5.23-August-201635.15  lakhs
6.13-September-201627.96  lakhs
7.26-October-201626.41  lakhs
8.21-January-201720.61  lakhs
9.30-June-201721.95  lakhs
Total 239.23  lakhs
% Payment 95.64 %
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 246     No. of Test Done : 265      No. of Test Passed : 252      No. of Test Failed : 13   Test report of this package
Number of Pics Available on Web Repository: 89
Number of Notice(s) issued: 62

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.21-01-20171+00Giving instructions about retaining wall by EE sirAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
2.21-12-20160+900Gradation of g2 materials checked by SE sir 7th circleAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
3.21-12-20160+900Wbm g1 ,g2,,g3 and PC thickness checking by SE sir 7th circleAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
4.21-12-20160/180Inspection of cause way by 7th circle S.E. sir & A.e. sir & checking thicknessSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
5.04-12-20163/300Cooliwall in perogreshSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
6.22-10-2016Ch. 1500PC laying & rollingRahul PanwarSurvey EngineerNH Srinagar See Pic
7.22-10-2016Ch. 1590PC Laying and RollingRahul PanwarSurvey EngineerNH Srinagar See Pic
8.20-10-2016Ch. 2200PC rollingRahul PanwarSurvey EngineerNH Srinagar See Pic
9.19-10-2016Ch. 0+850Screening material laying over G3Rahul PanwarSurvey EngineerNH Srinagar See Pic
10.18-10-2016Ch. 0.850Prime coat surfaceRahul PanwarSurvey EngineerNH Srinagar See Pic
11.18-10-2016Ch. 2200Tack coat layingRahul PanwarSurvey EngineerNH Srinagar See Pic
12.14-10-2016Ch. 2250Thickness checkingAmod Kumar ThakurREDSC1 R&B WB Rudraprayag See Pic
13.14-10-2016CH. 2300PC + seal coat surfaceAmod Kumar ThakurREDSC1 R&B WB Rudraprayag See Pic
14.14-10-20162+300Seal coat Temperature checking at layingAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
15.14-10-20162+300Laying of seal coatAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
16.27-08-20161050demage road due to land slideJagat Chand RamolaJEUDRP R&B Guptkashi See Pic
17.17-08-20161180slipJagat Chand RamolaJEUDRP R&B Guptkashi See Pic
18.17-08-20161+00Settlement due to land slideAnurag Rawat AEAEUDRP R&B Guptkashi See Pic
19.20-07-2016980r/wall demage due to heavy slipJagat Chand RamolaJEUDRP R&B Guptkashi See Pic
20.20-07-2016950slip clearance work on progressJagat Chand RamolaJEUDRP R&B Guptkashi See Pic