Package Profile Report

UDRP/AF/BR/79 Agreement signed
Project: UDRP-AF(Bridge/Slope) Package No.: 644 Package Name: UDRP/AF/BR/79 Sanction Cost: 171.27  lakhs
District: Uttarkashi Block: Dunda Constituency: Gangotri Circle:
DEA: DEA Uttarkashi DSC: TPF Getinsa Euroestudios S.L. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  4121   Steel Girder Bridle Bridge over Jalkur River on Sem Bhardar Gajna Bridle Road (36.000 M.) (in prorgress)
Procurement:
Package No.: 644        Package Name: UDRP/AF/BR/79        Tender Date: 11-11-2019        Current Status: Agreement signed        Achieved on Date: 29-09-2020

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/AF/BR/79        Contractor Name: M/S Utsav Associate       
Start Date: 06-11-2020        Intended Completion Date: 31-03-2022        Original End Date:  05-02-2022
Total Bond Cost: 16727986.49 (167.28 lakhs)       
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 3563064 for 426 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Other Allied Works & Finishing Work 1.00 Job4.351.00 Job0.00 Job00.00
2.Foundation RHS1.00 Job7.151.00 Job1.00 Job1.657.15
3.Foundation LHS1.00 Job7.151.00 Job1.00 Job1.657.15
4.Abutment Superstructure RHS1.00 Job7.951.00 Job0.50 Job0.923.98
5.Abutment Superstructure LHS1.00 Job7.951.00 Job0.50 Job0.923.98
6.Fixing of chequered Plate/RCC Deck88.80 sqm0.9088.80 sqm0.00 sqm00.00
7.Steel Railing/crush barrier74.40 m1.0874.40 m0.00 m00.00
8.Approach Ramp /path 1.00 m19.261.00 m0.00 m00.00
9.Protection Work1.00 Job30.751.00 Job0.00 Job00.00
10.Errection Work1.00 Job21.761.00 Job0.00 Job00.00
11.Fabrication Work1.00 job39.781.00 job0.00 job00.00
12.Fixing Bearing/Slab Casting1.00 job1.271.00 job0.00 job00.00
Total Amount: 149.35 5.14   22.26
Remarks: No Remarks       Work Program Made On: 29-01-2021      
Work Program Status:Program Failed
Financial Progress
SNo. Date Payment
1.31-July-202121.17  lakhs
2.02-November-202119.93  lakhs
Total 41.1  lakhs
% Payment 24.57 %
Advance Amount:  13.88  lakhs        Recovered Amount:  13.88  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Analysis:Physical Progress Wrongly Reported.
Pending Environmental & Social issues
Environment & Social Compliances(Package level): PUC vehicles, workmen Insurance
Environment & Social Compliances(Sub Project level):
Steel Girder Bridle Bridge over Jalkur River on Sem Bhardar Gajna Bridle Road(4121)No Pending Issue
Detailed report of this Package
Quality
No. of Test Required : 256     No. of Test Done : 294      No. of Test Passed : 293      No. of Test Failed : 1   Test report of this package
Number of Pics Available on Web Repository: 51
No Notice issued.

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.16-11-2021BR/79A2,cap concrete sampling work in progress, concrete grade M35.Niraj pathakunknownunknown See Pic
2.16-11-2021Sembhardhar Gajna Bridle BridgeAbutment A1 side shuttering work completed for capAjay Singh Rana ` ` See Pic
3.13-11-2021Sembhardhar Gajna Bridle BridgeCap reinforcement work on progressAjay Singh Rana ` ` See Pic
4.13-10-2021Sembhardar km1Cap casting A2 side at sembhardar BR/79Deepak ` ` See Pic
5.17-07-2021Km01Abutment R.H.S side Protection work in Progress at 36 M span Steel Girder Bridge Sembhardar UttarkashiYogesh Dobhalunknownunknown See Pic
6.17-07-2021Sembhardhar Gajna Bridle BridgeAbutment A1 side Protection work on progressAjay Singh Rana ` ` See Pic
7.07-07-2021Sem bhardarT.s Survey For Abutment R.H.S and L.H.S side Cap Marking At 36M span Steel Girder Bridge District UttarkashiYogesh Dobhalunknownunknown See Pic
8.07-07-2021Sembhardhar Gajna Bridle BridgeT.S. Survey for Abutment LHS and RHS side for Cap and Padestal markingAjay Singh Rana ` ` See Pic
9.01-07-2021Sembhardhar Gajna Bridle BridgeAbhutment A1 side earthwork for gabionsAjay Singh Ranaunknownunknown See Pic
10.01-07-2021Sembhardhar Gajna Bridle BridgeA2 side 4th lift Deshuttering work on progressAjay Singh Rana ` ` See Pic
11.01-07-2021Sembhardhar Gajna Bridle BridgeAbutment A2 side 4th lift M-35 Grade concreting work on progressAjay Singh Ranaunknownunknown See Pic
12.26-06-2021Sembhardhar Gajna Bridle BridgeA2 side 4th lift reinforcement steel work on progressAjay Singh Rana ` ` See Pic
13.26-06-2021Sembhardhar bridle bridgeSembhardhar Bridle Bridge A2 side 4th lift reinforcement checkingAjay Singh Rana ` ` See Pic
14.16-06-2021Sembhardhar Gajna Bridle BridgeA2 side 3rd lift reinforcement work on progressAjay Singh Rana ` ` See Pic
15.16-06-2021SembhardarAbutment R. H. S side IIIrd lift Steel checking at sembhardar BridgeYogesh Dobhalunknownunknown See Pic
16.16-06-2021SembhardarAbutment R. H. S side IIIrd lift Steel Checking at 36 M Span Steel Guider Bridge Sembhardar Distt UttarkashiYogesh Dobhalunknownunknown See Pic
17.15-06-2021Km/79A2,RHS, wall 1st lift concrete mix slump test on progress. Concrete grade M35.Niraj pathakunknownunknown See Pic
18.15-06-2021BR/79A2,RHS, wall1st lift concrete sampling work on progress. Concrete grade M35Niraj pathakunknownunknown See Pic
19.15-06-2021BR/79.A2,RHS,wall 2nd lift concrete sampling work on progress, concrete grade M35.Niraj pathakunknownunknown See Pic
20.15-06-2021BR/79A2,RHS,wall2nd lift concrete slump test done. Concrete grade m35.Niraj pathakunknownunknown See Pic