Package Profile Report

                            Project:               District:               Package: 

Package Profile Report

UDRP/AF/BR/42 Agreement signed
Project: UDRP-AF(Bridge/Slope) Package No.: 633 Package Name: UDRP/AF/BR/42 Sanction Cost: 807.77  lakhs
District: Bageshwar Block: Kapkot Constituency: Kapkote Circle:
DEA: DEA Bageshwar DSC: TPF Getinsa Euroestudios S.L. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  4115   7-M Span Motor Bridge from KM-18 of Bageshwar-Kapkot MR of Kapkot to Lili MR (80.000 M.) (in prorgress)
Procurement:
Package No.: 633        Package Name: UDRP/AF/BR/42        Tender Date: 11-11-2019        Current Status: Agreement signed        Achieved on Date: 24-06-2020

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/AF/BR/42        Contractor Name: M. S. Associates       
Start Date: 10-07-2020        Intended Completion Date: 09-01-2022       
Total Bond Cost: 78090724.53 (780.91 lakhs)       
LD Analysis for Milestone1: calculated LD is Rs 28541895 for 731 days        LD Analysis for Milestone2: calculated LD is Rs 28541895 for 731 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Env. Man & Moni Plan1.00 Job4.571.00 Job0.00 Job00.00
2.Other Allied Works & Finishing Work 1.00 Job12.651.00 Job0.00 Job00.00
3.Foundation RHS1.00 Job18.881.00 Job0.00 Job00.00
4.Foundation LHS1.00 Job18.881.00 Job0.00 Job00.00
5.Abutment Superstructure RHS1.00 Job6.870.00 Job0.00 Job00.00
6.Abutment Superstructure LHS1.00 Job6.870.00 Job0.00 Job00.00
7.Fixing of chequered Plate/RCC Deck1.00 sqm13.130.00 sqm0.00 sqm00.00
8.Steel Railing/crush barrier1.00 m9.750.00 m0.00 m00.00
9.Approach Ramp /path 1.00 m69.910.00 m0.00 m00.00
10.Protection Work1.00 Job47.010.00 Job0.00 Job00.00
11.Errection Work1.00 Job191.920.00 Job0.00 Job00.00
12.Fabrication Work1.00 job328.980.00 job0.00 job00.00
13.Abutment Substructure RHS1.00 Job25.731.00 Job0.00 Job00.00
14.Abutment Substructure LHS1.00 Job25.731.00 Job0.00 Job00.00
Total Amount: 780.88 0   0
Remarks: No Remarks       Work Program Made On: 16-10-2020       Updation of work program on: 17-03-2021      
Work Program Status:Program Expired.
Financial Progress
No Financial Progress.
Analysis:Not applicable because there is no Physical and Financial Progress
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Environment & Social Compliances(Package level): PUC vehicles
Environment & Social Compliances(Sub Project level):
7-M Span Motor Bridge from KM-18 of Bageshwar-Kapkot MR of Kapkot to Lili MR(4115)EMP Land Owner Consent, Helmet, Jacket, Boot, Glove, Signs, Sanitation Facility, project information board, water sprinkling, debris disposal
Detailed report of this Package
Quality
No. of Test Required : 6     No. of Test Done : 6      No. of Test Passed : 6      No. of Test Failed : 0   Test report of this package
Number of Pics Available on Web Repository: 9
No Notice issued.

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.27-01-2022Bhitarkot to par junior high school district BageshwarApproach road work in progress at A1 (LHS).Sanky patwal ` ` See Pic
2.27-01-2022Bhitarkot to par junior high school district BageshwarApproach road work in progress at A1 (LHS).Sanky patwal ` ` See Pic
3.12-10-2021TestTest purpose onlyTest ` ` See Pic
4.18-03-2021Anso Lily (BR-42), KM-18, District- BageshwarAbutment A1 & A2 location 80m span steel truss motorable bridge at Anso Lily (BR-42), KM-18, District- BageshwarLalit Kumar (SS) ` ` See Pic
5.18-03-2021Anso Lily (BR-42), KM-18, District- BageshwarAbutment A1 & A2 location 80m span steel truss motorable bridge at Anso Lily (BR-42), KM-18, District- BageshwarLalit Kumar (SS) ` ` See Pic
6.18-03-2021Anso Lily (BR-42), KM-18, District- BageshwarAbutment A1 side location 80m span steel truss motorable bridge at Anso Lily (BR-42), KM-18, District- BageshwarLalit Kumar (SS) ` ` See Pic
7.18-03-2021Anso Lily (BR-42), KM-18, District- BageshwarAbutment A2 side location 80m span steel truss motorable bridge at Anso Lily (BR-42), KM-18, District- BageshwarLalit Kumar (SS) ` ` See Pic
8.18-03-2021Anso Lily (BR-42), KM-18, District- BageshwarAbutment A1 side location 80m span steel truss motorable bridge at Anso Lily (BR-42), KM-18, District- BageshwarLalit Kumar (SS) ` ` See Pic
9.18-03-2021Anso Lily (BR-42), KM-18, District- BageshwarAbutment A2 side 80m span steel truss motorable bridge at Anso Lily (BR-42), KM-18, District- BageshwarLalit Kumar (SS) ` ` See Pic