Package Profile Report

                            Project:               District:               Package: 

Package Profile Report

UDRP/AF/BR/63 Agreement signed
Project: UDRP-AF(Bridge/Slope) Package No.: 632 Package Name: UDRP/AF/BR/63 Sanction Cost: 218.42  lakhs
District: Tehri Block: Narendra Nagar Constituency: Narendra Nagar Circle:
DEA: DEA Tehri DSC: TPF Getinsa Euroestudios S.L. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  4061   Bridge on KM-7 of Agrakhal Kusraila MR (30.000 M.) (in prorgress)
Procurement:
Package No.: 632        Package Name: UDRP/AF/BR/63        Tender Date: 11-10-2019        Current Status: Agreement signed        Achieved on Date: 12-02-2020

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/AF/BR/63        Contractor Name: M/S Beer Chandra Ramola       
Start Date: 20-02-2020        Intended Completion Date: 27-10-2021        Original End Date:  19-02-2021
Total Bond Cost: 20571232.64 (205.71 lakhs)        Variation Cost: -221244.05 (-2.21 lakhs)     Hence Total Bond Cost is   20349988.59 (203.5 lakhs) 
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 4278976 for 416 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Other Allied Works & Finishing Work 1.00 Job7.781.00 Job0.50 Job1.893.89
2.Foundation RHS1.00 Job6.321.00 Job1.00 Job3.076.32
3.Foundation LHS1.00 Job6.321.00 Job1.00 Job3.076.32
4.Steel Railing/crush barrier110.00 m3.33110.00 m110.00 m1.623.33
5.Approach Ramp /path 95.00 m45.3195.00 m0.00 m00.00
6.Protection Work1.00 Job20.651.00 Job0.80 Job8.0316.52
7.Errection Work1.00 Job20.911.00 Job1.00 Job10.1620.91
8.Fabrication Work1.00 job49.821.00 job1.00 job24.2249.82
9.Abutment Substructure RHS1.00 Job15.981.00 Job1.00 Job7.7715.98
10.Abutment Substructure LHS1.00 Job15.981.00 Job1.00 Job7.7715.98
11.Fixing Bearing/Slab Casting1.00 job11.801.00 job1.00 job5.7411.80
12.Wearing Coat12.31 Cum1.5212.31 Cum12.31 Cum0.741.52
Total Amount: 205.72 74.08   152.39
Remarks: No Remarks       Work Program Made On: 19-02-2021       Updation of work program on: 21-09-2021      
Work Program Status:Program Expired.
Financial Progress
SNo. Date Payment
1.26-March-202199.77  lakhs
2.28-June-202136.44  lakhs
3.21-September-202115.77  lakhs
Total 151.98  lakhs
% Payment 74.68 %
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Environment & Social Compliances(Package level): PUC vehicles
Environment & Social Compliances(Sub Project level):
Bridge on KM-7 of Agrakhal Kusraila MR(4061) water sprinkling, Query
Detailed report of this Package
Quality
No. of Test Required : 219     No. of Test Done : 219      No. of Test Passed : 219      No. of Test Failed : 0   Test report of this package
Number of Pics Available on Web Repository: 69
No Notice issued.

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.24-07-2021Agrakhal kusherela km 7Crush Barrier M -40 Casting work on progressVikash Baboounknownunknown See Pic
2.10-07-2021Agrakhal Kushrela km 7Slab CastingSudhir Kumar ` ` See Pic
3.07-07-2021Agrakhal Km-07Deck Slab castingVikas Vermaunknownunknown See Pic
4.06-07-2021Agrakhal-Kusraila KM-07Agrakhal-Kusraila KM-07 Deck Slab RCC M-35 Casting DoneSuresh Prasad ` ` See Pic
5.06-07-2021Agrakhal kusherela km 7Agrakhal kusherela km 7 Deck Slab Casting completed M-35Vikash Baboounknownunknown See Pic
6.03-07-2021Agrakhal kusrila Km-7Deck Slab steel bar binding workVikas Vermaunknownunknown See Pic
7.17-06-2021Agrakhal kusherela km 7AB1 Side Shaft & Retaining wall1st Lift CastingVikash Baboounknownunknown See Pic
8.16-06-2021KM-7 Agrakhal KushrailaBar Binding work in progress Deck SlabVikas Vermaunknownunknown See Pic
9.12-06-2021Agrakhal Kushrela km 7Bearing TestingSudhir Kumar ` ` See Pic
10.25-05-2021Chamasari Majhada km 2Concrete work in progress Return WallSudhir Kumar ` ` See Pic
11.25-05-2021Agrakhal Kushrela km 7Errection work in progressSudhir Kumar ` ` See Pic
12.15-05-2021Agrakhal Kushrela km 7Errection work in progressSudhir Kumar ` ` See Pic
13.06-05-2021Agrakhal Kushrela km 7Errection work in progressSudhir Kumar ` ` See Pic
14.06-05-2021Agrakhal Kushrela km 7Errection work in progressSudhir Kumar ` ` See Pic
15.15-04-2021Agrakhal Kushrela km 7Preparation for ErractionSudhir Kumar ` ` See Pic
16.24-03-2021Agrakhal km-7Gabion work in progressVikas Vermaunknownunknown See Pic
17.23-03-2021Agrakhal Kushrela km 7Checking of R/WallSudhir Kumar ` ` See Pic
18.20-03-2021Agrakhal Kushrela km 7Checking of Ground Erraction by EE SirSudhir Kumar ` ` See Pic
19.19-03-2021Agrakhal Kushrela km 7Checking of Ground ErractionSudhir Kumar ` ` See Pic
20.17-03-2021Agrakhal kusherela km 7R/wall MeasurementVikash Baboounknownunknown See Pic