Package Profile Report

                            Project:               District:               Package: 

Package Profile Report

UDRP/PWD/09/01/RD/013 (a) Agreement signed
Project: UDRP-RB Package No.: 62 Package Name: UDRP/PWD/09/01/RD/013 (a) Sanction Cost: 124.63  lakhs
District: Almora Block: Hawal Bagh Constituency: Someshwar Circle: Pithoragarh WB Circle
DEA: DEA Bageshwar DSC: Royal Haskoning DHV DSC Scope: only Supervision No.of Sub project : 1
Subproject in this package
1  1055   Khunt -Almora Road (11.500 KM.) (completed)
Procurement:
Package No.: 62        Package Name: UDRP/PWD/09/01/RD/013 (a)        Tender Date: 20-11-2014        Current Status: Agreement signed        Achieved on Date: 18-06-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/09/01/RD/013 (a)        Contractor Name: Jagat Singh Kanwal       
Start Date: 24-06-2015        Intended Completion Date: 23-09-2016       
Total Bond Cost: 12463320.3 (124.63 lakhs)        Variation Cost: -5028335.44 (-50.28 lakhs)     Hence Total Bond Cost is   7434984.86 (74.35 lakhs) 
LD Analysis for Milestone1: calculated LD is Rs 280440 for 45 days        LD Analysis for Milestone2: calculated LD is Rs 523488 for 84 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.R/Wall, B/ Wall Type Protection works273.00 m26.20273.00 m273.00 m35.3426.20
2.G-30.10 KM0.790.10 KM0.10 KM1.070.79
3.PC/CC i/c Prime Coat, Tack Coat0.10 KM1.240.10 KM0.10 KM1.671.24
4.Cause Way1.00 No0.981.00 No1.00 No1.320.98
5.Culverts/Scupper 9.00 No18.849.00 No9.00 No25.4218.84
6.longitudinal Drain5455.00 m5.355455.00 m5455.00 m7.215.35
7.Crash Barrier544.00 m13.52544.00 m544.00 m18.2413.52
8.Parapet94.00 No3.4894.00 No94.00 No4.73.48
9.Road Furniture64.00 No2.4564.00 No64.00 No3.312.45
10.Other Allied Works & Finishing Work 1.00 Job1.281.00 Job1.00 Job1.731.28
Total Amount: 74.13 100   74.13
Remarks: No Remarks       Work Program Made On: 03-10-2015       Updation of work program on: 27-11-2017      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.16-December-201519.99  lakhs
2.19-March-201621.33  lakhs
3.22-July-201621.89  lakhs
4.18-November-20164.40  lakhs
5.13-April-20176.73  lakhs
Total 74.34  lakhs
% Payment 99.99 %
Advance Amount:  10.00  lakhs        Recovered Amount:  10.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 171     No. of Test Done : 170      No. of Test Passed : 159      No. of Test Failed : 11   Test report of this package
Number of Pics Available on Web Repository: 41
Number of Notice(s) issued: 72

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.22-11-2016Ch-8+010Culvert inspection by SE NH haldwaniMukesh Kumar Yadav 2QCDSC5 R&B WB Bageshwar See Pic
2.22-11-2016Ch-7+725Culvert inspection by SE NH haldwaniMukesh Kumar Yadav 2QCDSC5 R&B WB Bageshwar See Pic
3.28-09-2016Ch-8+450PMC Laying ragected Because only 10 mm aggregate are usedMukesh Kumar Yadav 2QCDSC5 R&B WB Bageshwar See Pic
4.04-09-2016Ch-1+350Existing Causeway inspection by AE & RE SirMukesh Kumar Yadav 2QCDSC5 R&B WB Bageshwar See Pic
5.02-09-2016Ch-5+075Site inspection by ReMukesh Kumar Yadav 2QCDSC5 R&B WB Bageshwar See Pic
6.09-07-2016Ch 8.950Parapat completeJagdish Narayan Meenaunknownunknown See Pic
7.09-07-2016Ch 8.290Parapat constructionJagdish Narayan Meenaunknownunknown See Pic
8.14-06-2016Ch 8.450Y p joshi sir visitJagdish Narayan Meenaunknownunknown See Pic
9.27-04-2016Ch 4.900Inspection by YP joshi sir ,EE sir & TL sirJagdish Narayan Meenaunknownunknown See Pic
10.04-01-2016Ch 8.000Excavation for scupperJagdish Narayan Meenaunknownunknown See Pic
11.04-01-2016Ch 8.950Kuchha drainJagdish Narayan Meenaunknownunknown See Pic
12.04-01-2016Ch 8.025Dressing of stone for r/wallJagdish Narayan Meenaunknownunknown See Pic
13.04-01-2016Ch 4.900R/wall banded completedJagdish Narayan Meenaunknownunknown See Pic
14.04-01-2016Ch 4.900Bed block curingJagdish Narayan Meenaunknownunknown See Pic
15.07-11-2015Ch 6.225Dry R/wallJagdish Narayan Meenaunknownunknown See Pic
16.03-10-20159.00MeetingSubhash KumarSite EngineerDSC5 R&B WB Almora See Pic
17.03-10-20158.925R/wSubhash KumarSite EngineerDSC5 R&B WB Almora See Pic
18.03-10-20158.950Social expert visit and r/wNarendra SinghJEUDRP R&B Bageshwar See Pic
19.22-09-20158.925Scrupper workNarendra SinghJEUDRP R&B Bageshwar See Pic
20.16-09-20158.950Retaining wallPrateek GuptaSite EngineerDSC5 R&B WB Almora See Pic