Package Profile Report

UDRP/AF/35(BR) Agreement signed
Project: UDRP-AF(Bridge/Slope) Package No.: 608 Package Name: UDRP/AF/35(BR) Sanction Cost: 1027.01  lakhs
District: Udham Singh Nagar Block: Sitarganj Constituency: Sitarganj Circle:
DEA: DEA Nanital DSC: TPF Getinsa Euroestudios S.L. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  4099   Sukhi River (120.000 M.) (completed)
Procurement:
Package No.: 608        Package Name: UDRP/AF/35(BR)        Tender Date: 10-01-2019        Current Status: Agreement signed        Achieved on Date: 03-06-2019

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/AF/35(BR)        Contractor Name: Doon Infrastructure Ltd.       
Start Date: 15-06-2019        Intended Completion Date: 28-02-2022        Original End Date:  14-09-2020
Total Bond Cost: 94827516.3 (948.28 lakhs)        Variation Cost: 16048163.49 (160.48 lakhs)     Hence Total Bond Cost is   110875679.79 (1108.76 lakhs) 
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 29538922 for 623 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Stressing & Grouting48.00 Job69.44120.00 Job120.00 Job6.5669.44
2.Env. Man & Moni Plan45.00 Job5.1045.00 Job45.00 Job0.485.10
3.Other Allied Works & Finishing Work 12.00 Job27.5712.00 Job12.00 Job2.6127.57
4.Deck Cable laying, stretching and Fixing Transoms/Deck Slab 6.00 no83.226.00 no6.00 no7.8683.22
5.Steel Railing/crush barrier240.00 m28.87360.00 m360.00 m2.7328.87
6.Approach Ramp /path 850.00 m156.96850.00 m850.00 m14.83156.96
7.Protection Work4.00 Job175.354.00 Job4.00 Job16.57175.35
8.Fixing Bearing/Slab Casting48.00 job15.0248.00 job48.00 job1.4215.02
9.Back Wall/ Approach slab2.00 job10.052.00 job2.00 job0.9510.05
10.Providing and laying cutting6.78 mt6.086.78 mt6.78 mt0.576.08
11.Concreting Well Curb and Steaming7.00 job179.207.00 job7.00 job16.93179.20
12.Well Sinking160.38 rmt25.41149.00 rmt149.00 rmt2.425.41
13.Bottom Plug/Top Plug329.00 Cum40.32329.00 Cum329.00 Cum3.8140.32
14.Sand Filling2087.52 Cum41.212087.52 Cum2087.52 Cum3.8941.21
15.Well-Abutments/Pier/Shafts/Caps7.00 job63.737.00 job7.00 job6.0263.73
16.PSC girder & Diaphragms24.00 No118.4224.00 No24.00 No11.19118.42
17.Wearing Coat101.75 Cum12.42101.75 Cum101.75 Cum1.1712.42
Total Amount: 1058.37 100   1058.37
Remarks: No Remarks       Work Program Made On: 26-11-2019       Updation of work program on: 27-01-2022      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.06-January-202070.21  lakhs
2.29-December-20200.00  lakhs
3.19-February-2021438.96  lakhs
4.30-March-202183.45  lakhs
5.31-May-2021106.06  lakhs
6.27-August-202192.03  lakhs
7.01-November-202197.52  lakhs
8.03-January-202254.70  lakhs
9.19-February-202253.66  lakhs
10.15-June-202261.29  lakhs
11.28-July-202250.72  lakhs
Total 1108.6  lakhs
% Payment 99.99 %
Advance Amount:  113.28  lakhs        Recovered Amount:  113.28  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 4737     No. of Test Done : 4834      No. of Test Passed : 4763      No. of Test Failed : 71   Test report of this package
Number of Pics Available on Web Repository: 443
No Notice issued.

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.27-04-2022BR 35Thermo plastic Rode Rode markingSantosh Shukla ` ` See Pic
2.04-03-2022A1 SiteCrush Variar post fixingSantosh Shukla ` ` See Pic
3.02-03-2022510 +715DBM laying work in progressSantosh Shukla ` ` See Pic
4.01-03-2022Ch 120 to 1060DBM and BC laying in progressChhatrapati Pant ` ` See Pic
5.01-03-2022A1 siteBC work in CompelledSantosh Shukla ` ` See Pic
6.01-03-2022A1 siteBC leyin work in progressSantosh Shukla ` ` See Pic
7.01-03-2022Ch 120 to 1060BC laying in progress ( BR 35)Chhatrapati Pant ` ` See Pic
8.28-02-2022815 +1060BC work in progressSantosh Shukla ` ` See Pic
9.28-02-2022Ch 513.5 to 1060BC laying in ProgressChhatrapati Pant ` ` See Pic
10.28-02-2022Ch 513.5 to 1060 (A2 Side Approach)BC laying in progressChhatrapati Pant ` ` See Pic
11.28-02-2022Chainage 120 to 330BC laying in ProgressChhatrapati Pant ` ` See Pic
12.28-02-2022BR 35BC 1st grade Bitumen Extraction testSantosh Shukla ` ` See Pic
13.28-02-2022715 + 1030DBM laying in progressSantosh Shukla ` ` See Pic
14.25-02-2022Ch 120 to 715DBM laying in progressChhatrapati Pant ` ` See Pic
15.08-02-2022Ch 295 to 330A1 Side retaining wall foundation protection work( Gabion Wall) in progressChhatrapati Pant ` ` See Pic
16.17-01-2022Ch 190 Box CulvertBox Culvert wall 2nd lift concrete doneChhatrapati Pant ` ` See Pic
17.17-01-2022Ch190 Box CulvertBox Culvert concrete workChhatrapati Pant ` ` See Pic
18.15-01-2022A1 Abutment 295 + 230Protection workSantosh Shukla ` ` See Pic
19.15-01-2022Ch 295 to 330Protection work A1 sideChhatrapati Pant ` ` See Pic
20.15-01-2022Ch 190 Box CulvertReinforcement and Concrete work for Box Culvert BR35Chhatrapati Pant ` ` See Pic