UDRP/AF/33(BR) Agreement signed
Project: UDRP-AF(Bridge/Slope) Package No.: 605 Package Name: UDRP/AF/33(BR) Sanction Cost: 580.74  lakhs
District: Uttarkashi Block: Bhatwari Constituency: Gangotri Circle:
DEA: DEA Uttarkashi DSC: TPF Getinsa Euroestudios S.L. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  4089   50M Span Steel Truss Motor Bridge Korigaad (50.000 M.) (completed)
Procurement:
Package No.: 605        Package Name: UDRP/AF/33(BR)        Tender Date: 24-01-2018        Current Status: Agreement signed        Achieved on Date: 29-06-2018

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/AF/33(BR)        Contractor Name: Kailash Hillways Engineering Associates       
Start Date: 07-07-2018        Intended Completion Date: 26-07-2020        Original End Date:  06-10-2019
Total Bond Cost: 49492438.24 (494.92 lakhs)        Variation Cost: -2278279.47 (-22.78 lakhs)     Hence Total Bond Cost is   47214158.77 (472.14 lakhs) 
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 11556382 for 467 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.R/Wall, B/ Wall Type Protection works125.00 m18.82125.00 m125.00 m4.4118.82
2.PC/CC i/c Prime Coat, Tack Coat1.00 KM2.331.00 KM1.00 KM0.552.33
3.Parapet258.00 No8.22258.00 No258.00 No1.938.22
4.Other Allied Works & Finishing Work 1.00 Job0.511.00 Job1.00 Job0.120.51
5.Foundation RHS1.00 Job66.461.00 Job1.00 Job15.5766.46
6.Foundation LHS1.00 Job12.001.00 Job1.00 Job2.8112.00
7.Abutment Superstructure RHS1.00 Job11.231.00 Job1.00 Job2.6311.23
8.Abutment Superstructure LHS1.00 Job44.141.00 Job1.00 Job10.3444.14
9.Steel Railing/crush barrier87.40 m5.5687.40 m87.40 m1.35.56
10.Approach Ramp /path 105.00 m34.28105.00 m105.00 m8.0334.28
11.Protection Work1.00 Job30.501.00 Job1.00 Job7.1530.50
12.Errection Work1.00 Job30.141.00 Job1.00 Job7.0630.14
13.Gabion work250.00 m32.91250.00 m250.00 m7.7132.91
14.Fabrication Work1.00 job112.591.00 job1.00 job26.37112.59
15.Fixing Bearing/Slab Casting1.00 job15.091.00 job1.00 job3.5415.09
16.Back Wall/ Approach slab1.00 job2.111.00 job1.00 job0.52.11
Total Amount: 426.89 100   426.89
Remarks: No Remarks       Work Program Made On: 28-03-2019       Updation of work program on: 04-12-2020      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.21-December-201851.00  lakhs
2.30-March-201913.81  lakhs
3.31-May-201952.98  lakhs
4.16-June-201925.16  lakhs
5.27-August-201917.69  lakhs
6.18-October-2019106.20  lakhs
7.10-December-201920.58  lakhs
8.02-June-202040.03  lakhs
9.31-July-202055.04  lakhs
10.11-November-20201.50  lakhs
11.14-December-202039.64  lakhs
Total 423.63  lakhs
% Payment 89.73 %
Advance Amount:  47.00  lakhs        Recovered Amount:  47.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Analysis:Bill should be issued
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 758     No. of Test Done : 801      No. of Test Passed : 801      No. of Test Failed : 0   Test report of this package
Number of Pics Available on Web Repository: 183
No Notice issued.

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.17-07-2020Km 10Wearing coarse work is complete.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
2.24-06-2020Km 10Expansion strip seal fixing work in progress.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
3.24-06-2020Km 10Abutment A2 side approach road.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
4.24-06-2020Km 10Deck slab rainforesment work in progress.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
5.24-06-2020Km 10Deck slab rainforesment work in progress.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
6.11-06-2020Km 10Site laboratory ruteen test on progress.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
7.11-06-2020Km 10Deck slab crash barrier rainforesment work in progress.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
8.07-06-2020Km 10Abutment A2 approach road primix carpet work completed.(cold mix)Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
9.07-06-2020Km 10Abutment A1 side approach road primix carpet work completed.(cold mix).Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
10.06-06-2020Km 10After seal coat rolling work in progress.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
11.06-06-2020Km 10After primix carpet seal coat work in progress at abutment A1 side.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
12.06-06-2020Km 10Prime coat spray work completed at abutment A1 side approach road.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
13.06-06-2020Km 10Prime coat spray work in progress at abutment A1 side.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
14.06-06-2020Km 10Drainage spouts.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
15.05-06-2020Korigaad bridgeDeck reinforcement work is in progress at korigaad bridge in district uttarkashi.Deepak PantSite supervisiorUDRP AF Irrigation birahi See Pic
16.05-06-2020Korigaad bridgeParapet white washing work is in progress at korigaad bridge in district uttarkashi.Deepak PantSite supervisiorUDRP AF Irrigation birahi See Pic
17.04-06-2020Km 10Steel rainforesment work in progress.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
18.04-06-2020Km 10Drain spouts fixing discussion with contractor.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
19.04-06-2020Km 10Bitumen emulsion stock for approach road primix carpet work.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic
20.04-06-2020Km 10Perapet white wash work in progress.Neeraj PathakQCDSC WB Bridge Uttarkashi See Pic