UDRP/PWD/07/17/RD/044 Agreement signed
Project: UDRP-RB Package No.: 44 Package Name: UDRP/PWD/07/17/RD/044 Sanction Cost: 596.70  lakhs
District: Pithoragarh Block: Dharchula Constituency: Dharchula Circle: Pithoragarh WB Circle
DEA: DEA Askot DSC: Yongma Engineering Co. Ltd. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  2379   Baluwakot Paiya-Pori MR (9.400 KM.) (completed)
Procurement:
Package No.: 44        Package Name: UDRP/PWD/07/17/RD/044        Tender Date: 04-07-2015        Current Status: Agreement signed        Achieved on Date: 21-09-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/07/17/RD/044        Contractor Name: Kunwar Construction JV       
Start Date: 28-09-2015        Intended Completion Date: 30-04-2018        Original End Date:  27-12-2016
Total Bond Cost: 29375047.45 (293.75 lakhs)        Variation Cost: 26785184.69 (267.85 lakhs)     Hence Total Bond Cost is   56160232.14 (561.6 lakhs) 
LD Analysis for Milestone1: calculated LD is Rs 161568 for 11 days        LD Analysis for Milestone2: calculated LD is Rs 3216672 for 219 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Hill side Cutting & Slip clearence7.50 KM109.837.50 KM7.50 KM20.89109.83
2.R/Wall, B/ Wall Type Protection works1100.00 m79.401436.00 m1436.00 m15.179.40
3.G-20.99 KM6.511.75 KM1.75 KM1.246.51
4.G-39.30 KM77.509.20 KM9.20 KM14.7477.50
5.PC/CC i/c Prime Coat, Tack Coat9.30 KM94.999.20 KM9.20 KM18.0794.99
6.Cause Way0.00 No0.000.00 No0.00 No00.00
7.Culverts/Scupper 20.00 No96.7121.00 No21.00 No18.496.71
8.longitudinal Drain9300.00 m33.579300.00 m9300.00 m6.3833.57
9.Crash Barrier0.00 m0.000.00 m0.00 m00.00
10.Parapet200.00 No7.83332.00 No332.00 No1.497.83
11.Road Furniture390.00 No4.22390.00 No390.00 No0.84.22
12.Other Allied Works & Finishing Work 1.00 Job15.181.00 Job1.00 Job2.8915.18
Total Amount: 525.74 100   525.74
Remarks: No Remarks       Work Program Made On: 17-11-2015       Updation of work program on: 16-05-2018      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.31-December-201532.94  lakhs
2.12-February-201622.64  lakhs
3.17-March-20164.13  lakhs
4.26-November-201614.04  lakhs
5.30-December-20169.03  lakhs
6.31-January-201739.62  lakhs
7.28-February-201717.42  lakhs
8.31-March-201751.13  lakhs
9.30-April-20176.78  lakhs
10.31-May-201712.06  lakhs
11.30-June-201726.05  lakhs
12.31-July-201715.10  lakhs
13.15-September-20179.88  lakhs
14.12-October-201714.45  lakhs
15.26-November-201714.42  lakhs
16.30-December-201742.39  lakhs
17.12-January-201823.58  lakhs
18.16-February-201832.20  lakhs
19.26-February-201830.03  lakhs
20.16-March-201828.34  lakhs
21.04-April-201837.09  lakhs
22.22-May-201839.02  lakhs
23.07-June-201810.08  lakhs
24.08-August-20188.10  lakhs
25.30-October-201831.18  lakhs
26.09-March-201913.33  lakhs
Total 585.03  lakhs
% Payment 104.17 %
Advance Amount:  29.37  lakhs        Recovered Amount:  29.37  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 461     No. of Test Done : 463      No. of Test Passed : 461      No. of Test Failed : 2   Test report of this package
Number of Pics Available on Web Repository: 17
Number of Notice(s) issued: 80

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.08-06-2018Sample collection at chainage 2+450Third party testing sampleVinod Prakash SinghJEUDRP R&B Askot See Pic
2.08-06-2018Thickness checking and sample collection for third party testingAt chainage 4+950Vinod Prakash SinghJEUDRP R&B Askot See Pic
3.08-06-2018Sample collection for third party testingAt chainage 6+600Vinod Prakash SinghJEUDRP R&B Askot See Pic
4.07-03-20187+100Retaining Wall at Cutting Rocky AreaManoj BhattREDSC2 R&B WB Pauri See Pic
5.16-12-2017Ch.1+750Rolling of seal coatAbid Ali SiddequeeQCDSC4 R&B WB Pithoragarh See Pic
6.22-08-20176+100Stone HP behind the Dry stone masonry for retaining wall in progressManoj BhattREDSC2 R&B WB Pauri See Pic
7.22-08-20177+100Hill side cutting under progressManoj BhattREDSC2 R&B WB Pauri See Pic
8.05-11-2016Km 8Verification of proposed variation by CE PWD Pithoragarh on 27-09-2016. Road width is only 3.00 m.Arun Kumar PandeyEEUDRP R&B Askot See Pic
9.05-11-2016Km 4Checking of proposed variation by CE PWD Pithoragarh on 27-09-2016Arun Kumar PandeyEEUDRP R&B Askot See Pic
10.05-11-2016Km 5Checking of proposed variation by CE PWD Pithoragarh on 27-09-2016.Arun Kumar PandeyEEUDRP R&B Askot See Pic
11.05-11-20167+250Chainage showing required hill side cutting to make road motorable for heavy vehicles.Arun Kumar PandeyEEUDRP R&B Askot See Pic
12.24-09-20167+150Site visit by cme,se,ee&tl sirShailendra Kumar SinghREDSC4 R&B WB Askot See Pic
13.24-09-20167+180Site visit by cme, se, ee&tl sir discussion about Hillside cuttingShailendra Kumar SinghREDSC4 R&B WB Askot See Pic
14.24-09-20165+450Site visit by cme, EE, tlsir discussion about Hillside cuttingShailendra Kumar SinghREDSC4 R&B WB Askot See Pic
15.03-02-20161+00Dry Retaining wallShailendra Kumar SinghREDSC4 R&B WB Askot See Pic
16.03-02-20160+00Information boardShailendra Kumar SinghREDSC4 R&B WB Askot See Pic
17.23-04-2015S E lnspectionKm 16D K AryaEEDEA WB Askot See Pic