Package Profile Report

18A/BC/PIU/BRIDCUL/PB/2018 Agreement signed
Project: UDRP-H Package No.: 2269 Package Name: 18A/BC/PIU/BRIDCUL/PB/2018 Sanction Cost: 30.28  lakhs
District: Rudraprayag Block: August Muni Constituency: Kedarnath Circle:
DEA: DEA PB DSC: Sheladia Associates DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  7323   Retrofitting and Renovation of Government Inter College Peeradhanpur (0.000 KM.) (completed)
Procurement:
Package No.: 2269        Package Name: 18A/BC/PIU/BRIDCUL/PB/2018        Tender Date: 19-12-2018        Current Status: Agreement signed        Achieved on Date: 28-01-2019

Construction Phase

Agreement Details
Bond/Agreement Name: 18A/BC/PIU/BRIDCUL/PB/2018        Contractor Name: Surat Singh & Sons       
Start Date: 28-01-2019        Intended Completion Date: 30-06-2019        Original End Date:  28-05-2019
Total Bond Cost: 2734374.83 (27.34 lakhs)       
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 209151 for 153 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Env. Man & Moni Plan1.00 Job0.881.00 Job1.00 Job3.240.88
2.Retrofitting1.00 job12.721.00 job1.00 job46.5112.72
3.Renovation1.00 job13.741.00 job1.00 job50.2613.74
Total Amount: 27.34 100   27.34
Remarks: No Remarks       Work Program Made On: 27-03-2019      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.04-June-20194.21  lakhs
2.29-August-201916.63  lakhs
Total 20.84  lakhs
% Payment 76.23 %
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Analysis:Bill should be issued
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 6     No. of Test Done : 6      No. of Test Passed : 6      No. of Test Failed : 0   Test report of this package
Number of Pics Available on Web Repository: 42
No Notice issued.

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.28-05-2019G I C Peera DhanpurCeiling plaster work in progress.Himanshu SharmaJEUDRP-H Rudraprayag See Pic
2.28-05-2019G I C Peera DhanpurPlaster work in progress.Himanshu SharmaJEUDRP-H Rudraprayag See Pic
3.08-05-2019G I C Peera DhanpurWater proofing work in progress at Block AHimanshu SharmaJEUDRP-H Rudraprayag See Pic
4.08-05-2019G I C Peera DhanpurCuringHimanshu SharmaJEUDRP-H Rudraprayag See Pic
5.02-05-2019G I C Peera DhanpurWire mesh fixing at Block E, inner wallsHimanshu SharmaJEUDRP-H Rudraprayag See Pic
6.02-05-2019G I C Peera DhanpurFixing wire mesh at Block EHimanshu SharmaJEUDRP-H Rudraprayag See Pic
7.28-04-2019G I C Peera DhanpurWater proofing work at Block G in progress.Himanshu SharmaJEUDRP-H Rudraprayag See Pic
8.28-04-2019G I C Peera DhanpurWater proofing treatment work in progress.Himanshu SharmaJEUDRP-H Rudraprayag See Pic
9.28-04-2019G I C Peera DhanpurRetro fitting-BLOCK A, drilling holesHimanshu SharmaJEUDRP-H Rudraprayag See Pic
10.28-04-2019G I C Peera DhanpurRetro fitting-BLOCK E (Roof treatment -pre surface treatment)Himanshu SharmaJEUDRP-H Rudraprayag See Pic
11.22-04-2019G I C PEERA DHANPURBlock- GHimanshu SharmaJEUDRP-H Rudraprayag See Pic
12.22-04-2019G I C Peera DhanpurBlock AHimanshu SharmaJEUDRP-H Rudraprayag See Pic
13.22-04-2019G I C Peera DhanpurBlock AHimanshu SharmaJEUDRP-H Rudraprayag See Pic
14.22-04-2019G I C Peera DhanpurBlock-FHimanshu SharmaJEUDRP-H Rudraprayag See Pic
15.22-04-2019G I C Peera DhanpurBlock DHimanshu SharmaJEUDRP-H Rudraprayag See Pic
16.16-03-2019G I C KothgiGroove cutting for fixing additional reinforcement in Lintel band level at Block A.Himanshu SharmaJEUDRP-H Rudraprayag See Pic
17.16-03-2019G I C KothgiGroove cutting for fixing additional reinforcement at Lintel bend level at Block B.Himanshu SharmaJEUDRP-H Rudraprayag See Pic
18.16-03-2019G I C KothgiChipping of unsound material for water proofing at Block CHimanshu SharmaJEUDRP-H Rudraprayag See Pic
19.16-03-2019G I C Peera DhanpurMasonry work for closing of earlier windows in progress.Himanshu SharmaJEUDRP-H Rudraprayag See Pic
20.16-03-2019G I C Peera DhanpurChipping of unsound material over roof for water proofing at Block AHimanshu SharmaJEUDRP-H Rudraprayag See Pic