Package Profile Report

UDRP/PWD/09/01/RD/013(N) Agreement signed
Project: UDRP-RB Package No.: 147 Package Name: UDRP/PWD/09/01/RD/013(N) Sanction Cost: 783.84  lakhs
District: Almora Block: Lamgarha Constituency: Jageshwar Circle: Pithoragarh WB Circle
DEA: DEA Bageshwar DSC: Royal Haskoning DHV DSC Scope: only Supervision No.of Sub project : 2
Subproject in this package
1  1044   Dhora-Ratankhan Motor Road (5.850 KM.) (completed)
2  1059   Vishnath-Jaskot Road (8.000 KM.) (in prorgress)
Procurement:
Package No.: 147        Package Name: UDRP/PWD/09/01/RD/013(N)        Tender Date: 11-06-2018        Current Status: Agreement signed        Achieved on Date: 22-10-2018

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/09/01/RD/013(N)        Contractor Name: Technical Consultant and Construction Associates       
Start Date: 30-10-2018        Intended Completion Date: 30-11-2019        Original End Date:  29-06-2019
Total Bond Cost: 40389569.89 (403.9 lakhs)        Variation Cost: 546545.88 (5.47 lakhs)     Hence Total Bond Cost is   40936115.77 (409.36 lakhs) 
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: Ld Not applicable       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Hill side Cutting & Slip clearence0.69 KM7.860.69 KM0.69 KM2.027.86
2.R/Wall, B/ Wall Type Protection works600.00 m39.43600.00 m600.00 m10.0539.43
3.G-23.25 KM39.043.50 KM3.25 KM9.4236.28
4.G-311.90 KM76.9611.90 KM11.65 KM19.1675.41
5.PC/CC i/c Prime Coat, Tack Coat13.75 KM109.7313.75 KM12.90 KM26.29103.14
6.Cause Way3.00 No15.207.00 No3.00 No3.7515.20
7.Culverts/Scupper 13.00 No31.2213.00 No13.00 No7.9631.22
8.longitudinal Drain11450.00 m14.7011450.00 m11450.00 m3.7614.70
9.Crash Barrier500.00 m18.27500.00 m500.00 m4.6518.27
10.Parapet254.00 No6.57254.00 No254.00 No1.666.57
11.Road Furniture580.00 No3.69580.00 No580.00 No0.943.69
12.Env. Man & Moni Plan2.00 Job6.092.00 Job2.00 Job1.556.09
13.Other Allied Works & Finishing Work 2.00 Job23.212.00 Job2.00 Job5.9223.21
Total Amount: 391.97 97.14   381.07
Remarks: No Remarks       Work Program Made On: 17-11-2018       Updation of work program on: 15-03-2021      
Work Program Status:This Package contain more than one subproject,pleae check individua subproject for Program Expired.
Financial Progress
SNo. Date Payment
1.16-November-201833.66  lakhs
2.13-December-201824.50  lakhs
3.09-January-201927.48  lakhs
4.15-February-201950.17  lakhs
5.18-March-201918.82  lakhs
6.17-May-201955.55  lakhs
7.03-June-201930.92  lakhs
8.20-September-201940.97  lakhs
9.21-June-201920.71  lakhs
10.25-June-201913.22  lakhs
11.29-June-201915.62  lakhs
Total 331.62  lakhs
% Payment 81.01 %
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Analysis:Bill should be issued
Pending Environmental & Social issues
Environment & Social Compliances(Package level):No Pending Issue
Environment & Social Compliances(Sub Project level):
Vishnath-Jaskot Road(1059)EMP Land Owner Consent, Glove, water sprinkling, debris disposal
Vishnath-Jaskot Road(1059)EMP Land Owner Consent, Glove, water sprinkling, debris disposal
Detailed report of this Package
Quality
No. of Test Required : 20     No. of Test Done : 20      No. of Test Passed : 20      No. of Test Failed : 0   Test report of this package
Number of Pics Available on Web Repository: 216
Number of Notice(s) issued: 1

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.06-11-20197+600World bank mission visit..Azhar ShadJEUDRP R&B Bageshwar See Pic
2.06-11-20197+500World Bank mission visit..Azhar ShadJEUDRP R&B Bageshwar See Pic
3.13-05-20191+600Rolling over p.c..Azhar ShadJEUDRP R&B Bageshwar See Pic
4.13-05-20191+700Rolling over P.C..Azhar ShadJEUDRP R&B Bageshwar See Pic
5.13-05-20191+700Rolling over P.C..Azhar ShadJEUDRP R&B Bageshwar See Pic
6.09-05-20192+575PC laying in progress...Azhar ShadJEUDRP R&B Bageshwar See Pic
7.27-04-20195+900Rolling over p.c..Azhar ShadJEUDRP R&B Bageshwar See Pic
8.27-04-20192+100Surface cleaning is in progress..Azhar ShadJEUDRP R&B Bageshwar See Pic
9.25-04-2019Ch 4.200CE sir and SE sir and EE sir inspectionJagdish Narayan Meenaunknownunknown See Pic
10.25-04-2019Ch 5.600CE sir, SE sir and EE sir inspectionJagdish Narayan Meenaunknownunknown See Pic
11.25-04-2019Ch 5.600CE sir, SE sir and EE sir inspectionJagdish Narayan Meenaunknownunknown See Pic
12.28-02-20190+000Site visit by Rajesh pant sir C.M.E sir..Azhar ShadJEUDRP R&B Bageshwar See Pic
13.28-02-20191+325Rolling over G-3..Azhar ShadJEUDRP R&B Bageshwar See Pic
14.28-02-20191+300Rolling over G-3..Azhar ShadJEUDRP R&B Bageshwar See Pic
15.05-02-20195+290Excavation For K.C drain..Azhar ShadJEUDRP R&B Bageshwar See Pic
16.05-02-20195+300Excavation For K.C drain..Azhar ShadJEUDRP R&B Bageshwar See Pic
17.02-02-20193+300Fixing of crash barrier posts..Azhar ShadJEUDRP R&B Bageshwar See Pic
18.29-01-2019Ch 4.250CME and EE sir inspectionJagdish Narayan Meenaunknownunknown See Pic
19.19-01-20192+450Casting of half causeway.PQC..Azhar ShadJEUDRP R&B Bageshwar See Pic
20.19-01-20195+425Casting of half causeway PQC...Azhar ShadJEUDRP R&B Bageshwar See Pic