Package Profile Report

                            Project:               District:               Package: 

Package Profile Report

UDRP/PWD/03/RD/129 Agreement signed
Project: UDRP-RB Package No.: 145 Package Name: UDRP/PWD/03/RD/129 Sanction Cost: 918.72  lakhs
District: Rudraprayag Block: 0017 Constituency: 7 Circle:
DEA: DEA Guptkashi DSC: Yongma Engineering Co. Ltd. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  2568   Kandai Kamoldi Molkakhal MR Phase2 (Ch-0 to 10 Km) (10.000 KM.) (in prorgress)
Procurement:
Package No.: 145        Package Name: UDRP/PWD/03/RD/129        Tender Date: 07-04-2017        Current Status: Agreement signed        Achieved on Date: 14-11-2017

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/03/RD/129        Contractor Name: Tomar Construction Company       
Start Date: 21-11-2017        Intended Completion Date: 20-02-2019       
Total Bond Cost: 73800626.64 (738.01 lakhs)       
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 6937200 for 188 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Hill side Cutting & Slip clearence10.00 KM82.6810.00 KM7.00 KM7.8457.87
2.R/Wall, B/ Wall Type Protection works1384.00 m148.661384.00 m450.00 m6.5548.34
3.G-214.25 KM89.0114.25 KM1.50 KM1.279.37
4.G-37.65 KM45.657.65 KM0.00 KM00.00
5.PC/CC i/c Prime Coat, Tack Coat10.00 KM115.9810.00 KM0.00 KM00.00
6.Cause Way3.00 No15.993.00 No0.00 No00.00
7.Culverts/Scupper 28.00 No66.4128.00 No8.00 No2.5718.98
8.longitudinal Drain9955.00 m40.689955.00 m0.00 m00.00
9.Crash Barrier1450.00 m36.251450.00 m0.00 m00.00
10.Parapet950.00 No34.30950.00 No0.00 No00.00
11.Road Furniture594.00 No18.18594.00 No0.00 No00.00
12.Other Allied Works & Finishing Work 1.00 Job44.331.00 Job0.00 Job00.00
Total Amount: 738.12 18.23   134.56
Remarks: No Remarks       Work Program Made On: 29-12-2017       Updation of work program on: 24-04-2018      
Work Program Status:Program Failed
Financial Progress
SNo. Date Payment
1.17-February-201848.18  lakhs
2.28-March-201855.24  lakhs
Total 103.42  lakhs
% Payment 14.01 %
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 288     No. of Test Done : 305      No. of Test Passed : 300      No. of Test Failed : 5   Test report of this package
Number of Pics Available on Web Repository: 36
Number of Notice(s) issued: 31

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.16-05-2018Site labA.I.v. testSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
2.20-04-2018At labWbm g2 aiv test and result found satisfactoryPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
3.20-04-2018At labWbm g2 gradation test, material found oversize and instructions given to contractor urgently rebroken stone.Prashant KumarQCDSC4 R&B WB Rudraprayag See Pic
4.10-04-20185+225Checkup of labours by CMS and physician, District hospital, Rudraprayag during health camp at Kandai-Kamoldi MRPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
5.10-04-20185+225On the occasion of world health week, health camp settup on site of kandai kamoldi molkhakhalPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
6.29-03-20185+100Water sprinklingPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
7.20-03-20184+900Slab castingPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
8.17-03-20187+000Social expert neha mam site visitPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
9.13-03-20183/050Slab reinforcementSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
10.12-03-2018at ch. 4+000Public grievance discussion Dpm sir, so. e. Sir and ee sirPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
11.12-03-20180+000Dpm sir visit with s.e.sir and ee sirPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
12.04-03-20182+800Hill side cuttingPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
13.14-02-20184/700Hill side cuttingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
14.08-02-20184+000Gram sabha held for grievance discussion at shipuriPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
15.01-02-20182/300Dumping zoneSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
16.01-02-20181/350Damping zoneSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
17.28-01-2018At labFire safetyPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
18.25-01-20181+450Scupper slab castingPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
19.23-01-2018SE sir and EE sir site visitPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
20.22-01-20182/050Hill side cuttingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic