UDRP/PWD/03/RD/129 Agreement signed
Project: UDRP-RB Package No.: 145 Package Name: UDRP/PWD/03/RD/129 Sanction Cost: 918.72  lakhs
District: Rudraprayag Block: 0017 Constituency: 7 Circle:
DEA: DEA Guptkashi DSC: Yongma Engineering Co. Ltd. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  2568   Kandai Kamoldi Molkakhal MR Phase2 (Ch-0 to 10 Km) (10.000 KM.) (in prorgress)
Procurement:
Package No.: 145        Package Name: UDRP/PWD/03/RD/129        Tender Date: 07-04-2017        Current Status: Agreement signed        Achieved on Date: 14-11-2017

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/03/RD/129        Contractor Name: Tomar Construction Company       
Start Date: 21-11-2017        Intended Completion Date: 20-02-2019       
Total Bond Cost: 73800626.64 (738.01 lakhs)       
LD Analysis for Milestone1: calculated LD is Rs 3616200 for 98 days        LD Analysis for Milestone2: calculated LD is Rs 3616200 for 98 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Hill side Cutting & Slip clearence10.00 KM82.6810.00 KM1.00 KM1.128.27
2.R/Wall, B/ Wall Type Protection works1384.00 m148.661384.00 m0.00 m00.00
3.G-214.25 KM89.0114.25 KM0.00 KM00.00
4.G-37.65 KM45.657.65 KM0.00 KM00.00
5.PC/CC i/c Prime Coat, Tack Coat10.00 KM115.9810.00 KM0.00 KM00.00
6.Cause Way3.00 No15.993.00 No0.00 No00.00
7.Culverts/Scupper 28.00 No66.4128.00 No2.00 No0.644.74
8.longitudinal Drain9955.00 m40.689955.00 m0.00 m00.00
9.Crash Barrier1450.00 m36.251450.00 m0.00 m00.00
10.Parapet950.00 No34.30950.00 No0.00 No00.00
11.Road Furniture594.00 No18.18594.00 No0.00 No00.00
12.Other Allied Works & Finishing Work 1.00 Job44.331.00 Job0.00 Job00.00
Total Amount: 738.12 1.76   13.01
Remarks: No Remarks       Work Program Made On: 29-12-2017       Updation of work program on: 04-01-2018      
Work Program Status:Program Failed
Financial Progress
No Financial Progress.
Analysis:Not applicable because there is no Physical and Financial Progress
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Environment & Social Compliances(Package level): PUC vehicles, labour licence
Environment & Social Compliances(Sub Project level):
Kandai Kamoldi Molkakhal MR Phase2 (Ch-0 to 10 Km)(2568) water sprinkling, Query
Detailed report of this Package
Quality
No. of Test Required : 78     No. of Test Done : 86      No. of Test Passed : 85      No. of Test Failed : 1   Test report of this package
Number of Pics Available on Web Repository: 24
Number of Notice(s) issued: 29

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.14-02-20184/700Hill side cuttingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
2.08-02-20184+000Gram sabha held for grievance discussion at shipuriPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
3.01-02-20182/300Dumping zoneSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
4.01-02-20181/350Damping zoneSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
5.28-01-2018At labFire safetyPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
6.25-01-20181+450Scupper slab castingPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
7.23-01-2018SE sir and EE sir site visitPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
8.22-01-20182/050Hill side cuttingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
9.19-01-20187/300Scupper slab castingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
10.11-01-20187/100Scupper slab castingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
11.11-01-20181/700Hill side cuttingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
12.10-01-20188/275Hill side cuttingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
13.10-01-20187/175Scupper slabe castingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
14.10-01-20187+175Slump testPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
15.21-12-20171+110Hill side cutting work in progressPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
16.19-12-20171+000Hill side cutting work in progressPrashant KumarQCDSC4 R&B WB Rudraprayag See Pic
17.17-12-20170/975Hill side cuttingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
18.14-12-20171/025Hill side cuttingSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
19.14-12-20177/300Scupper work in progressSuresh Chandra SharmaJEUDRP R&B Tehri See Pic
20.14-12-20177/900R.R stone mesoneri in 1:5Suresh Chandra SharmaJEUDRP R&B Tehri See Pic