Package Profile Report

UDRP/PWD/03/RD/129 Agreement signed
Project: UDRP-RB Package No.: 145 Package Name: UDRP/PWD/03/RD/129 Sanction Cost: 918.72  lakhs
District: Rudraprayag Block: 0017 Constituency: 7 Circle:
DEA: DEA Guptkashi DSC: Yongma Engineering Co. Ltd. DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  2568   Kandai Kamoldi Molkakhal MR Phase2 (Ch-0 to 10 Km) (10.000 KM.) (in prorgress)
Procurement:
Package No.: 145        Package Name: UDRP/PWD/03/RD/129        Tender Date: 07-04-2017        Current Status: Agreement signed        Achieved on Date: 14-11-2017

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/03/RD/129        Contractor Name: Tomar Construction Company       
Start Date: 21-11-2017        Intended Completion Date: 20-02-2019       
Total Bond Cost: 73800626.64 (738.01 lakhs)        Variation Cost: 8592916.48 (85.93 lakhs)     Hence Total Bond Cost is   82393543.12 (823.94 lakhs) 
LD Analysis for Milestone1: Ld Not applicable        LD Analysis for Milestone2: calculated LD is Rs 13505400 for 366 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.Hill side Cutting & Slip clearence10.00 KM91.3510.00 KM9.00 KM9.9882.21
2.R/Wall, B/ Wall Type Protection works1384.00 m169.461384.00 m800.00 m11.8997.96
3.G-214.25 KM89.0114.25 KM9.00 KM6.8256.22
4.G-38.41 KM50.268.41 KM1.00 KM0.735.98
5.PC/CC i/c Prime Coat, Tack Coat10.00 KM115.9810.00 KM0.00 KM00.00
6.Cause Way4.00 No25.544.00 No1.00 No0.776.38
7.Culverts/Scupper 28.00 No95.6428.00 No18.00 No7.4661.48
8.longitudinal Drain9955.00 m45.779955.00 m5000.00 m2.7922.99
9.Crash Barrier1450.00 m41.401450.00 m0.00 m00.00
10.Parapet950.00 No34.30950.00 No0.00 No00.00
11.Road Furniture594.00 No21.78594.00 No0.00 No00.00
12.Other Allied Works & Finishing Work 1.00 Job43.451.00 Job0.00 Job00.00
Total Amount: 823.94 40.44   333.22
Remarks: No Remarks       Work Program Made On: 29-12-2017       Updation of work program on: 12-11-2018      
Work Program Status:Work Programme workable.
Financial Progress
SNo. Date Payment
1.17-February-201848.18  lakhs
2.28-March-201855.24  lakhs
3.16-May-201826.32  lakhs
4.05-July-201835.17  lakhs
5.21-August-201839.20  lakhs
6.30-September-201843.85  lakhs
7.31-October-201836.83  lakhs
Total 284.79  lakhs
% Payment 34.56 %
Advance Amount:  5.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  5.00  lakhs        * Advances are at package level not sub project level
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 395     No. of Test Done : 414      No. of Test Passed : 409      No. of Test Failed : 5   Test report of this package
Number of Pics Available on Web Repository: 77
Number of Notice(s) issued: 32

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.30-10-2018Bitumen batching plantTesting of bitumen contentRavi BishtJEUDRP R&B Guptkashi See Pic
2.30-10-201810/000Pc WorkSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
3.28-10-2018Bitumen batching plantBatching plant inspection by SE sirRavi BishtJEUDRP R&B Guptkashi See Pic
4.16-10-2018Km 7/00Cause way curingRavi BishtJEUDRP R&B Guptkashi See Pic
5.15-10-2018Km 2.600Slip removalRavi BishtJEUDRP R&B Guptkashi See Pic
6.29-09-2018Km 0/800Slip removalRavi BishtJEUDRP R&B Guptkashi See Pic
7.26-09-2018Km 2.7RR dry R/w.Ravi BishtJEUDRP R&B Guptkashi See Pic
8.18-09-20189/900W.b.m g2 seive analysisSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
9.18-09-20187/4003 m span culvert abutment mesoneriSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
10.13-09-20189/300Scupper slab reinforcementSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
11.11-09-2018Km 4.7Scupper slab castingRavi BishtJEUDRP R&B Guptkashi See Pic
12.05-09-2018QC labSite visit and lab inspection by SE sir.Ravi BishtJEUDRP R&B Guptkashi See Pic
13.30-08-20187/4003m span Culvert abutment mesoneriSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
14.29-08-2018Km 3.975Excavation for scupperRavi BishtJEUDRP R&B Guptkashi See Pic
15.24-08-2018Km 4.7seive analysis of sandRavi BishtJEUDRP R&B Guptkashi See Pic
16.21-08-20189/275Drain workSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
17.19-08-20187/000Scupper bed block castingSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
18.17-08-20181/000R/wall drySuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
19.17-08-20188/250E.e sir sait vigitSuresh Chandra SharmaJEUDRP R&B Guptkashi See Pic
20.16-08-2018Km 4.7Scupper abutment work in progressRavi BishtJEUDRP R&B Guptkashi See Pic