UDRP/PWD/05/51/RD/117 Agreement signed
Project: UDRP-RB Package No.: 129 Package Name: UDRP/PWD/05/51/RD/117 Sanction Cost: 70.60  lakhs
District: Dehradun Block: Sahaspur Constituency: Mussoorie Circle:
DEA: DEA Chakrata DSC: Egis International DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  1608   Johari Jakhan Motor Road (1.600 KM.) (completed)
Procurement:
Package No.: 129        Package Name: UDRP/PWD/05/51/RD/117        Tender Date: 28-04-2016        Current Status: Agreement signed        Achieved on Date: 30-06-2016

Construction Phase

Agreement Details
Bond/Agreement Name: UDRP/PWD/05/51/RD/117        Contractor Name: Shivom Construction       
Start Date: 07-07-2016        Intended Completion Date: 23-04-2017        Original End Date:  06-01-2017
Total Bond Cost: 6142238.98 (61.42 lakhs)       
LD Analysis for Milestone1: calculated LD is Rs 187331 for +61 days        LD Analysis for Milestone2: calculated LD is Rs 445295 for 145 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.GSB/RBI/G-10.10 KM0.750.10 KM0.10 KM1.280.75
2.G-20.20 KM1.240.20 KM0.20 KM2.111.24
3.G-30.20 KM0.810.20 KM0.20 KM1.380.81
4.PC/CC i/c Prime Coat, Tack Coat0.53 KM15.760.53 KM0.53 KM26.815.76
5.BM i/c Prime Coat, Tack Coat0.40 KM3.000.40 KM0.40 KM5.13.00
6.SDBC i/c Tackcoat1.20 KM15.991.20 KM1.20 KM27.1915.99
7.longitudinal Drain2000.00 m21.002000.00 m2000.00 m35.7121.00
8.Crash Barrier0.00 m0.000.00 m0.00 m00.00
9.Road Furniture2.00 No0.252.00 No2.00 No0.430.25
Total Amount: 58.8 100   58.8
Remarks: No Remarks       Work Program Made On: 05-09-2016       Updation of work program on: 08-05-2017      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.30-November-20165.02  lakhs
2.25-January-201713.46  lakhs
3.25-March-20179.53  lakhs
4.27-April-201714.45  lakhs
5.02-June-201710.43  lakhs
6.31-July-201715.87  lakhs
Total 68.76  lakhs
% Payment 111.95 %
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Analysis:Physical Progress Wrongly Reported.
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 82     No. of Test Done : 82      No. of Test Passed : 82      No. of Test Failed : 0   Test report of this package
Number of Pics Available on Web Repository: 77
Number of Notice(s) issued: 51

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.09-01-2018Site inspection by SE Sir n EE Mam WB PWD Tehri1.425Sudhir Kumar AEAEUDRP R&B Tehri See Pic
2.09-01-20180.110Site inspection by SE Sir n EE Mam WB PWD TehriSudhir Kumar AEAEUDRP R&B Tehri See Pic
3.16-05-2017Ch 0/18 towards johri villageShoulder work in progress at johari jakhan m/r. Quality is goodAshish KaluraAEUDRP R&B Chakrata See Pic
4.25-04-2017Ch 0/20 towards jakhan villageMeeting with local people at johari jakhan m/rAshish KaluraAEUDRP R&B Chakrata See Pic
5.25-04-2017Ch 0/26 near forest areaSite inspection by S.E sir world bank circle Tehri at johari jakhan m/rAshish KaluraAEUDRP R&B Chakrata See Pic
6.17-04-2017Ch 1/3 Near himalaya gardenSite inspection of johari jakhan m/r after laying of sdbc work on previous dayAshish KaluraAEUDRP R&B Chakrata See Pic
7.17-04-20170/28 near forest areaSite visit of johari jakhan m/r after completion of sdbc work on previous day.Ashish KaluraAEUDRP R&B Chakrata See Pic
8.14-04-2017Ch 1/6 near himalaya gardenRolling over Sdbc at johri jakhan m/r pkg 117Ashish KaluraAEUDRP R&B Chakrata See Pic
9.14-04-20170/25 towards johri villageSdbc work in progress at johari jakhan m/r,pkg 117Ashish KaluraAEUDRP R&B Chakrata See Pic
10.13-04-2017Bituminous plant near Selaque,DehradunBitumen content test at bituminous plant. Found satisfactory.pkg 117 johri jakhan m/rAshish KaluraAEUDRP R&B Chakrata See Pic
11.13-04-2017At ch 0/21-22SDBC Rolling work in progressRajan NautiyalJEUDRP R&B Chakrata See Pic
12.13-04-2017At Ch 0/9-10SDBC Rolling work checking in progress work found satisfactoryRajan NautiyalJEUDRP R&B Chakrata See Pic
13.13-04-2017At Ch 0/19-20SDBC thickness checking found satisfactory And Temperature = 132 degreeRajan NautiyalJEUDRP R&B Chakrata See Pic
14.13-04-2017At Ch 0/18-19SDBC Rolling in progressRajan NautiyalJEUDRP R&B Chakrata See Pic
15.13-04-2017At Ch 0/18-19SDBC work in progress and found satisfactoryRajan NautiyalJEUDRP R&B Chakrata See Pic
16.13-04-2017Ch 0/5 towards johri villageLaying of SDBC at johari jakhan m/rAshish KaluraAEUDRP R&B Chakrata See Pic
17.13-04-2017Ch 0/5 towards johri villageApplying tack coat on hungry surface at pkg 117 johari jakhan m/rAshish KaluraAEUDRP R&B Chakrata See Pic
18.13-04-2017At Bituminous plant selaqui,DehradunBitumen content test at bituminous plant. Pkg 117 johari jakhan m/rAshish KaluraAEUDRP R&B Chakrata See Pic
19.13-04-2017At bituminous plant near Selaqui,DehradunTemperature is checked at bituminous plant.found ok.pkg 117 johari jakhan m/rAshish KaluraAEUDRP R&B Chakrata See Pic
20.12-04-2017At Bituminous Plant near selaqui,DehradunBitumen content test at bituminous plant. Result- Bitumen content 5.1% found satisfactory.pkg 117 johari jakhan m/rAshish KaluraAEUDRP R&B Chakrata See Pic