UEAP/PWD/C-75 Agreement signed
Project: UEAP-RB Package No.: 1079 Package Name: UEAP/PWD/C-75 Sanction Cost: 477.00  lakhs
District: Pithoragarh Block: Munsiari Constituency: Dharchula Circle:
DEA: DEA UEAP Pithoragarh DSC: CCEE Group India Pvt.Ltd DSC Scope: Design and Supervision No.of Sub project : 1
Subproject in this package
1  5610   Reconstruction of internal roads of nagar panchayat Munsiyari (6.250 KM.) (completed)
Procurement:
Package No.: 1079        Package Name: UEAP/PWD/C-75        Tender Date: 27-06-2015        Current Status: Agreement signed        Achieved on Date: 28-10-2015

Construction Phase

Agreement Details
Bond/Agreement Name: UEAP/PWD/C-75        Contractor Name: R K Gupta Contractor       
Start Date: 18-11-2015        Intended Completion Date: 17-11-2016       
Total Bond Cost: 42904458 (429.04 lakhs)       
LD Analysis for Milestone1: calculated LD is Rs 879532 for 41 days        LD Analysis for Milestone2: calculated LD is Rs 2509884 for 117 days       
Component Wise Progress
SNo. Progress Name As per Work Programme As per Actual
Quantity Amount
(in lakhs)
Target Quantity Achieved Quantity Progress(in %) Cost of completed work
(in lakhs)
1.GSB/RBI/G-10.70 KM2.550.70 KM0.70 KM0.622.55
2.G-20.70 KM2.230.70 KM0.70 KM0.542.23
3.G-31.76 KM9.831.76 KM1.76 KM2.399.83
4.PC/CC i/c Prime Coat, Tack Coat1.76 KM14.831.76 KM1.76 KM3.6114.83
5.BM i/c Prime Coat, Tack Coat6.30 KM131.206.30 KM6.30 KM31.95131.20
6.SDBC i/c Tackcoat6.30 KM87.646.30 KM6.30 KM21.3487.64
7.longitudinal Drain6540.00 m69.526540.00 m6540.00 m16.9369.52
8.Crash Barrier3000.00 m90.003000.00 m3000.00 m21.9290.00
9.Road Furniture80.00 No2.8080.00 No80.00 No0.682.80
Total Amount: 410.6 100   410.6
Remarks: Package compleated on 31/05/2017       Work Program Made On: 12-09-2016      
Work Program Status:Task Finish.
Financial Progress
SNo. Date Payment
1.19-March-201652.64  lakhs
2.25-April-201627.64  lakhs
3.22-June-201685.63  lakhs
4.27-October-201627.76  lakhs
5.25-November-201638.45  lakhs
6.16-December-201619.20  lakhs
Total 251.32  lakhs
% Payment 58.58 %
Advance Amount:  0.00  lakhs        Recovered Amount:  0.00  lakhs        Balance to be Recovered  0.00  lakhs        * Advances are at package level not sub project level
Analysis:Bill should be issued
Pending Environmental & Social issues
Detailed report of this Package
Quality
No. of Test Required : 186     No. of Test Done : 182      No. of Test Passed : 161      No. of Test Failed : 0      No. of Test Result Awaited : 11   Test report of this package
Number of Pics Available on Web Repository: 56
Number of Notice(s) issued: 67

Mobile Pic Upload

( last 20 Pics)
SNo. Creation date Landmark Remark Data Collector Designation Orgnization Pic
1.10-11-2016Chng 0.000 to 0.100 gic roadTack coat on bm surface for sdbc layingAnkit NakotiAEUEAP- CA See Pic
2.10-11-2016Chng 0.150-0.175 G.I.C. RoadLoose thickness for sdbcAnkit NakotiAEUEAP- CA See Pic
3.10-11-2016Chng.150-.175 G.I.C. roadCompacted thickness reqd 25 mm loose thickness during layibg achieved as 35 mmAnkit NakotiAEUEAP- CA See Pic
4.10-11-2016Animal hosp road chng. .900 to 1.000 near zara hotel103 degree celcius temp achieved using evotherm addmixture at 2232 m altitudeAnkit NakotiAEUEAP- CA See Pic
5.26-10-20160.125 to 0.150 animal hospital aproach roadSdbc thickness loose 35 mm achieved during laying required thickness after compaction 25 mmAnkit NakotiAEUEAP- CA See Pic
6.26-10-2016Chng 0.250-0.200 animal hospital roadSdbc surface dUring rollingAnkit NakotiAEUEAP- CA See Pic
7.26-10-20160.375 near helipad animal hospital roadSdbc lahingAnkit NakotiAEUEAP- CA See Pic
8.26-10-2016Near helipadTack coat for.sdc laying @ animal.hospital roadAnkit NakotiAEUEAP- CA See Pic
9.26-10-2016Chng 0.600-0.650 animal hospital roadRolling on bm surfaceAnkit NakotiAEUEAP- CA See Pic
10.25-10-2016ChNg + 0.025 to +0.050Rolling on bm surfaceAnkit NakotiAEUEAP- CA See Pic
11.24-10-2016Near helipadRolling on bm surfaceAnkit NakotiAEUEAP- CA See Pic
12.24-10-2016Near helipadRolling om bm surfaceAnkit NakotiAEUEAP- CA See Pic
13.29-08-2016Police station aproach roadInspection se sirAnkit NakotiAEUEAP- CA See Pic
14.29-08-2016Dhandadhaar jyati m/rInspection of SE sir, for checking of grading for G2Ankit NakotiAEUEAP- CA See Pic
15.29-08-2016Polics statiom roadSe sir inspection for thickness of beam of crash barrierAnkit NakotiAEUEAP- CA See Pic
16.29-08-2016Police station approach road chng +.075Se sir inspection checkin standpost thicknessAnkit NakotiAEUEAP- CA See Pic
17.29-08-2016Gic college roadInspection of se sir wbm thicknessAnkit NakotiAEUEAP- CA See Pic
18.29-08-2016Police statin aproach road chng 0.050Se sir inspection for wbmAnkit NakotiAEUEAP- CA See Pic
19.16-06-2016Animal hospital roadS.E. Sir inspection on site instructed for proper runoff of water from road surface and cross drainage to be constructedAnkit NakotiAEUEAP- CA See Pic
20.15-06-2016Animal hospital roadS.E.sir site inspectionAnkit NakotiAEUEAP- CA See Pic