Image to be Discussed


27991

Pic Id: 27991 Uid: 2398
Subproject: Ogla Pathak Gaon narath-Bhagichauri MR District: Pithoragarh
Data Collector: Baldev Arya Designation: Site Supervisor
Organisation: DSC4 R&B WB Pithoragar
Landmark: 3+500 Remark: Rolling of PC
Date: 2017-04-11 16:09:03

Comments:


Yes the thickness of PC was 21mm. The laying temperature is kept about 110-120 degree centigrade. Rope is used to mark the borders by lime then removed, as the PC is done by paver. Drain has already been constructed. Patri is filled before PC and id dressed after PC.
By: Satyendra Mohan Upadhyay About Others
on 07-May-2017 08:59 AM

Have you check the thickness of PC after compaction. what is the temp. of PC mix at the time of laying. Use rope at the edges at the time of laying PC. Either shoulders and drains are maintained before laying PC.
By: adarsh About Quality
on 13-April-2017 15:09 PM


Last Five Images

32488Subproject Birsanikhal-Kota-Silsu-bhutnisi MR in Pauri on date 2018-08-24 13:29:11
32531Subproject Nainipatal Madmaley MR (Ch-7 to 13.162 Km) in Pithoragarh on date 2018-08-30 15:29:55
32535Subproject Kandai Kamoldi Molkakhal MR Phase2 (Ch-0 to 10 Km) in Rudraprayag on date 2018-08-30 16:47:50
32533Subproject Nainipatal Madmaley MR (Ch-7 to 13.162 Km) in Pithoragarh on date 2018-08-30 16:58:29
32577Subproject Bridge at Jokhna Laga Bura in Chamoli on date 2018-09-05 14:59:34

Random Images

25468
25452
24807
25106
30975
24174
7570
29213
25474

Leave a comment:

Pic Location Map

CAPTCHA code

Data at a Glance

  • Total no. of pics available in system
    31252
  • No. of pics got remarked.
    312
  • Total no. of pics recieved in this month.
    35
  • No. of pics got remarked in this month.
    9
© 2018 ukdisasterrecovery.in