Image to be Discussed


27991

Pic Id: 27991 Uid: 2398
Subproject: Ogla Pathak Gaon narath-Bhagichauri MR District: Pithoragarh
Data Collector: Baldev Arya Designation: Site Supervisor
Organisation: DSC4 R&B WB Pithoragar
Landmark: 3+500 Remark: Rolling of PC
Date: 2017-04-11 16:09:03

Comments:


Yes the thickness of PC was 21mm. The laying temperature is kept about 110-120 degree centigrade. Rope is used to mark the borders by lime then removed, as the PC is done by paver. Drain has already been constructed. Patri is filled before PC and id dressed after PC.
By: Satyendra Mohan Upadhyay About Others
on 07-May-2017 08:59 AM

Have you check the thickness of PC after compaction. what is the temp. of PC mix at the time of laying. Use rope at the edges at the time of laying PC. Either shoulders and drains are maintained before laying PC.
By: adarsh About Quality
on 13-April-2017 15:09 PM


Last Five Images

31664Subproject Katpudiya Chhina Seraghat MR (Ch-0 to 13 Km) in Bageshwar on date 2018-05-31 15:39:00
31666Subproject Katpudiya Chhina Seraghat MR (Ch-0 to 13 Km) in Bageshwar on date 2018-06-04 15:19:17
31667Subproject Katpudiya Chhina Seraghat MR (Ch-0 to 13 Km) in Bageshwar on date 2018-06-05 08:43:36
31658Subproject Okadi Ana Lohar Chada Gairlekh MR Phase2 (Ch-6 to 12 Km) in Bageshwar on date 2018-06-05 13:01:53
31662Subproject Okadi Ana Lohar Chada Gairlekh MR Phase2 (Ch-6 to 12 Km) in Bageshwar on date 2018-06-05 14:08:26

Random Images

31664
25672
23414
25106
31666
29018
24720
30784
24755

Leave a comment:

Pic Location Map

CAPTCHA code

Data at a Glance

  • Total no. of pics available in system
    31139
  • No. of pics got remarked.
    295
  • Total no. of pics recieved in this month.
    62
  • No. of pics got remarked in this month.
    0
© 2018 ukdisasterrecovery.in