Menu

Package Details

Package Name: UDRP/PWD/08/05/RD/98
Sno. Package No. Package Name UID Sub Project Name Length (in Km.) Cost (in lakhs)
1. 109 UDRP/PWD/08/05/RD/98 1118 Harinagri-Kulau-Gwaldam MR 17.000 956.10
Total Number of Sub Project(s): 1 Total Cost 956.10