UDRPAF

Bridges & Slope Protection Works
River Bank Protection Work
Public Building
  • Total 72 Bridges cost 473cr. has been sanctioned by High Powered Committee Out of which 53 Bridges, Cost 284cr have Awarded till date.
  • Status of Aggrement signed 47 Packages & 6 Packages are in Under signing Process.
  • DSC/BSC currently engagement for 02 packages (1 DSC + 1 BSC).
  • Under Financial Evaluation 10 No. of Package are in progress.

River Bank Protection Works

  • River bank protection in about 05 critical stretches to reduce the risk of river bank erosion and resulting loss of infrastructure, land and properties.
  • Total 5 works costs Rs 77 Cr has been sanctioned by HPC out of which all 5 have been awarded of costs Rs 68.6 Cr.
  • One CSC is engaged for all 5 Packages.

Environment Compliances at all 5 Site

  • Labour license obtained.
  •  Workmen compensation insurance obtained.
  • PUC certificate available.
  • ESHS Engineer available at site.
  • Water sprinkling being done as per site requirement.
  • First aid box provided at site and labour camp.
  • Soak Pit available at site for concrete washout.
  • Soak pit constructed at camp for liquid waste generated from Camp.
  • Dust bins installed at site and camp for waste management.
  • Non- biodegradable waste handed to municipal/local body.
  • Sanitation facility available at site as well as camp area.
  • Muck generated will be reused in backfilling.
  • Fire safety equipment’s provided at site and camp.
  • CTE/CTO available for crusher plant.
  • SDRF Building Jolly grant Dehradun    
  • USDMA Building IT Park Dehradun  
    • DSC I : TUV-SUD Agreement signed on
    • Strengthening Emergency Response Capacity-SDRF( II phases):   

Compliances

    •  Geological investigations completed for all sites. Social and Environmental screening completed.
    • Both sites SDRF - USDMA the COVID-19 Test have been conducted through medical camp.