G00732
Mr. Bharat Singh
-
Jaunpur, Tehri Garhwal
Bridge
The construction work of Chamasari Algad River Bridge is not up to the mark. They are using down quality material for the construction of Bridge. The JCB and loaded trucks are passing through our farms which destroys the cereals/grains.
UDRP R&B
Issue Solved
Chamasari_Algad_Bridge_(Mr._Bharat_Singh_Rawat)_1167.pdf
07-01-2017